首页|期刊导航|海河水利|任泽平原调蓄工程分区滞洪与错峰效能

任泽平原调蓄工程分区滞洪与错峰效能OA

Effectiveness of Zonal Flood Detention and Peak Staggering of the Renze Plain Regulation Project

中文摘要英文摘要

为降低大陆泽、宁晋泊蓄滞洪区环水村上游因河道洪水叠加、下泄不畅引发的淹没风险,探讨任泽平原调蓄工程的滞洪与错峰调度效能.通过水文计算和多方案调洪演算比选,确定工程优化布局与调度方案,将工程划分为3个区,总库容为3 200万 m³.结果表明,该工程可承接沙洺河、南澧河和顺水河5~10 a一遇区间洪水,并通过分区滞洪实现错峰调度;发生流域性洪水时,淹没面积可由130 km²以上降至25 km²以内,周边村庄受淹风险明显降低,防洪标准可提高至10 a一遇.研究成果可为平原地区蓄滞洪区精准调度及防洪体系建设提供参考.

To reduce the inundation risk in the villages upstream of Huanshui Village within the Daluze and Ningjinbo flood detention and retention areas,caused by the superposition of river floods and poor downstream discharge,this study investigates the effectiveness of flood detention and peak-staggering operation of the Renze Plain storage and regulation project.Through hydrological calculations and comparative analysis of multiple flood routing schemes,the optimal project layout and operation plan were determined.The project is divided into three zones,with a total storage capacity of 32 million m³.The results show that the project can intercept floods from the Shami River,Nanli River,and Shunshui River with a return period of 5 to 10 years,and achieve peak-staggering operation through zonal flood detention.In the event of a basin-wide flood,the inundated area can be reduced from over 130 km² to less than 25 km²,the flood risk to surrounding villages is significantly lowered,and the flood protection standard can be raised to a 1-in-10-year level.The findings of this study can serve as a reference for the precise operation of flood detention and retention areas and the development of flood control systems in plain regions.

曹欣欣;郭靖

天津市水务规划勘测设计有限公司,天津 300250中铁十八局集团有限公司勘察设计院,天津 300250

建筑与水利

任泽平原调蓄工程蓄滞洪区分区滞洪错峰调度防洪效益

Renze Plainstorage and regulation projectflood detention and retention areazonal flood detentionpeak-staggering operationflood control benefits

《海河水利》 2026 (9)

48-53,58,7

10.3969/j.issn.1004-7328.2026.09.008

评论