邕北灌区工程总干隧洞线路布置方案比选OA
Comparison and selection of route layout schemes for the main trunk tunnel of Yongbei Irrigation Zone Project
在灌区工程隧洞线路布置设计过程中,应根据灌区分布、受水点、地形地貌及制约因素综合分析,结合泵站及其衔接的管线、出水池等建筑物布置情况,通过对平面布置、输水线路长度、地形地质条件、征地移民、施工组织、投资等方面的因素进行比较,综合考虑后选定.本文结合邕北灌区总干隧洞线路布置设计过程,针对丘陵地区地形地貌和地质特点,论述灌区工程隧洞总体线路布置的设计思路.
In the process of tunnel route layout design for irrigation zone projects,it is essential to conduct a compre-hensive analysis that takes into account the distribution of the irrigation zone,water receiving points,topography and landform,and constraints,as well as the arrangement of pump stations and their connecting pipelines,outlet pools,and other associated structures.The optimal scheme should be determined based on a comprehensive evalua-tion through comparisons of the factors such as plane layout,length of the water conveyance route,topographic and geological conditions,land acquisition and resettlement,construction organization,and investment.Combined with the route layout design process of the main trunk tunnel of the Yongbei Irrigation Zone Project with respect to the topographic,landform and geological characteristics of the hilly area,this paper elaborates on the design concept for the overall tunnel route layout of irrigation zone projects.
邓燕霞
广西水利电力勘测设计研究院有限责任公司,南宁 530023
建筑与水利
岩溶区隧洞线路布置方案比选邕北灌区
karst arearoute layout of tunnelcomparison and selection of schemesYongbei Irrigation Zone
《广西水利水电》 2026 (5)
38-42,5
评论