暗挖隧道近距离斜下穿既有地铁车站的影响分析OA
Impact Analysis of Underground Tunnels Underpassing Subway Stations at a Close Distance Diagonally
为了评估不同加固措施对地表、车站及隧道初期支护位移的控制效果,并验证综合加固方案的工程适用性,以合肥市地铁 8 号线暗挖隧道近距离斜下穿既有 3 号线一里井车站为工程背景,采用MIDAS GTS NX有限元软件对无加固、临时仰拱、注浆、锚杆及综合加固5种工况进行模拟.研究发现:无加固工况下,地表、车站及初期支护最大沉降分别为 21.31,6.36,16.21 mm,均超出规范限值.单一加固措施中,临时仰拱通过刚性支撑显著降低了三者沉降,降幅为 27.59%,50.31%,33.99%;注浆加固通过围岩改良抑制初期支护沉降为 24.55%,但对地表和车站控制效果有限(降幅小于 15%);锚杆加固作用较弱(降幅小于 6%).综合加固通过"刚性支撑-围岩改良-局部锚固"协同机制,分别将沉降降至 13.34,2.15,6.93 mm(降幅为36.98%,66.19%,57.25%),均满足规范要求.实测数据与模拟结果吻合良好,验证了模型的可靠性及综合加固方案的可行性.
In order to evaluate the control effect of different reinforcement measures on the displacement of surface,station and tunnel initial support,and verify the engineering applicability of the comprehensive reinforcement scheme,taking the construction background of the underground tunnel of Hefei Metro Line 8,which underpasses the existing Line 3 Yilijing Station at a close distance diagonally.MIDAS GTS NX finite element software is used to simulate five working conditions:no reinforcement,temporary arch,grouting reinforcement,anchor rod and comprehensive reinforcement.The results indicate that under the unreinforced condition,the maximum settlements of the ground surface,station,and initial support reach 21.31,6.36,16.21 mm,respectively,all exceeding the specified limits.Among single reinforcement measures,the temporary inverted arch significantly reduces settlements by 27.59%,50.31%,33.99%through rigid support;grouting reinforcement suppressed initial support settlement by 24.55%via surrounding rock improvement but shows limited effectiveness on the ground surface and stations(reductions<15%);bolt reinforcement exhibits minimal impact(reductions<6%).Through the collaborative mechanism of"rigid support surrounding rock improvement local anchoring",the comprehensive reinforcement reduces the settlement to 13.34,2.15,6.93 mm respectively(with a reduction of 36.98%,66.19%,57.25%),all of which meet the requirements of the specifications.The measured data and simulation results show close agreement with simulation results,verifying the reliability of the model and the feasibility of the comprehensive reinforcement scheme.
晏俊杰;祝磊;吴天祚
安徽建筑大学 土木工程学院,安徽 合肥 230601||合肥大学 城市建设与交通学院,安徽 合肥 230601合肥大学 城市建设与交通学院,安徽 合肥 230601||合肥大学 城市轨道交通安全与应急管理安徽省重点实验室,安徽 合肥 230601中铁三局集团 华东建设有限公司,江苏 南京 211106
交通工程
暗挖隧道地铁车站下穿位移数值模拟
underground tunnelsubway stationunderpassingdisplacementnumerical simulation
《湖南工业大学学报》 2026 (5)
10-18,9
安徽省自然科学基金资助项目(2008085ME168)安徽省重点研究与开发计划标准化专项基金资助项目(202004h7020002)