极端暴雨下中小型水库链式风险识别与防控路径OA
Identification and prevention-control pathways for chain risks of small and medium-sized reservoirs under extreme rainstorms
在全球气候变化背景下,极端暴雨呈现短历时、高强度、局地性强等突出特征,我国中小型水库在极端暴雨情景下面临洪水输入激增、工程性能退化、预报精度不足及下游风险攀升等多重挑战.本文沿"洪水输入—工程承载—风险感知—调度干预—下游避险"五类风险传导环节,系统分析了极端暴雨条件下中小型水库的风险传递机理及现有管理体系的适配性.研究表明,极端暴雨对水库安全的影响在于风险传递速率加快、安全余量与避险时间同步压缩,形成典型的多环节耦合连锁风险.当前管理的主要问题集中在动态风险边界与静态复核标准、工程性能渐变与偏重巡查模式、多源信息增长与融合不足、滚动预报与调度衔接不够、复合灾害情景与常规应急保障之间的结构性错位.基于此,提出动态复核防洪能力、强化全周期工程诊断、推进雨水情-工情融合研判、完善滚动会商调度机制,并依据工程条件和下游洪水灾害影响识别主导风险链、实行"一库一策"的差异化治理模式等系统性防控对策.研究成果可为极端天气下中小型水库全过程安全管理提供理论支撑与实践参考.
Against the backdrop of global climate change,extreme rainstorms are increasingly characterized by short duration,high intensity,and strong local concentration.Under the extreme rainstorm scenarios,small and medium-sized reservoirs in China face multiple challenges,including sharp increases in flood inflow,degradation of engineering performance,insufficient forecast accuracy,and rising downstream risks.Following the five risk transmission links of"flood inflow—engineering capacity—risk perception—dispatch intervention—downstream evacuation",this paper systematically analyzes the risk transmission mechanisms of small and medium-sized reservoirs under extreme rainstorm conditions and the adaptability of the existing management system.The findings reveal that the impact of extreme rainstorms on reservoir safety lies in the accelerated rate of risk transmission and the simultaneous compression of safety margins and evacuation time,forming a typical multi-link coupled chain risk.The main problems in current management are concentrated in structural mismatches between dynamic risk boundaries and static recheck standards,gradual engineering performance degradation and an inspection-oriented model,the growth of multi-source information and insufficient integration,inadequate linkage between rolling forecasts and dispatch,and structural mismatch between compound disaster scenarios and conventional emergency support.Based on this,systematic prevention and control countermeasures are proposed,including dynamically rechecking flood control capacity,strengthening full-lifecycle engineering diagnosis,promoting integrated analysis of rainfall,flood,and engineering conditions,improving the rolling consultation and dispatch mechanism,and identifying dominant risk chains according to engineering conditions and downstream flood disaster impacts and implementing a differentiated"one reservoir,one policy"governance model.The research results can provide theoretical support and practical reference for the whole-process safety management of small and medium-sized reservoirs under extreme weather conditions.
樊峻;陈小平;李永蓉;胡斯曼;王志勉
湖北省水利厅,430071,武汉武汉长江科创科技发展有限公司,430010,武汉||长江水利委员会长江科学院,430000,武汉武汉长江科创科技发展有限公司,430010,武汉武汉长江科创科技发展有限公司,430010,武汉武汉长江科创科技发展有限公司,430010,武汉
建筑与水利
极端暴雨中小型水库安全运行风险防控监测预警防洪调度应急管理工程韧性
extreme rainstormsmall and medium-sized reservoirssafe operationrisk prevention and controlmonitoring and early warningflood control dispatchemergency managementengineering resilience
《中国水利》 2026 (18)
71-76,60,7
国家重点研发计划"干旱条件下三峡水库调度与长江中下游补水研究与应用"(2024YFC3214000)中央级公益性科研院所基本科研业务费项目"重点水利水电工程施工期智能安全管控平台关键技术研究与应用"(CKSF2026518/KJ).
评论