太浦河水闸与泵站联合调度运行研究OA
Joint operation and dispatching of Taipu River Sluice and pumping station in Taihu Lake basin
为构建并实践跨隶属关系近域耦合系统联合运行机制,破解太浦河水闸与泵站联合调度中控制运用难以适配水情动态变化的问题,本文以太湖流域太浦闸和太浦河泵站为研究对象,采用对比分析法和技术经济指标评价法,基于两项工程2019-2025年的实际运行数据和流域实况水情,重点对联合调度运行过程中临时关泵开闸和临时关闸开泵操作的边界条件进行分析与研究.研究结果表明:当太浦河泵站处于开泵供水工况时,若太浦闸上下游水位差≥2 cm,且太浦闸下游与平望水文站水位差>0 cm,上述实时监测数据持续时间≥30 min时,宜及时关泵开闸;当太浦闸处于开闸供水工况时,若太浦闸实时流量=0 m3/s,上述实时监测数据持续时间≥30 min时,宜及时关闸开泵.经技术经济指标评价法验证,该边界条件可有效提升泵站效率、降低能源单耗与供水成本,实现工程技术经济综合最优.研究成果可为太湖流域水工程调度指令执行与控制运用提供现实依据,为提升重要水工程调度精准度提供技术支撑,为长三角生态绿色一体化发展示范区供水安全提供坚实保障.
To establish and implement a joint operation mechanism for a near-field coupled system with cross-affiliation relationships,and to address the challenge that the control and operation in the joint dispatching of the Taipu River Sluice and pumping station cannot adapt to dynamic variations in hydrological conditions,this paper took the Taipu River Sluice and the Taipu River Pumping Station in the Taihu Lake basin as research objects.Using the comparative analysis method and techno-economic index evaluation method,and based on the actual operation data of the two projects from 2019 to 2025 as well as real-time basin hydrological conditions,the study focused on analyzing and investigating the boundary conditions for temporary pump shutdown with sluice opening and temporary sluice closure with pump startup during joint operation and dispatching.The results show that when the Taipu River Pumping Station operates in the water supply mode,the pump should be shut down and the sluice opened promptly if the water level difference between the upstream and downstream of the Taipu River Sluice is≥2 cm,the water level difference between the downstream of the Taipu River Sluice and Pingwang Hydrological Station is>0 cm,and such real-time monitoring data persist for no less than 30 min.When the Taipu River Sluice operates in the water supply mode,the sluice should be closed and the pump started promptly if the real-time flow rate is 0 m3/s,and the above real-time monitoring data last for at least 30 min.Verified by the techno-economic index evaluation method,the proposed boundary conditions can effectively improve pumping station efficiency,reduce unit energy consumption and water supply cost,and achieve comprehensive technical and economic optimality of the projects.The research findings can provide practical references for the implementation of regulation orders and control operation of hydraulic projects in the Taihu Lake basin,offer technical support for improving the regulation accuracy of key hydraulic projects,and lay a solid guarantee for water supply security in the eco-green integrated development demonstration zone in the Yangtze River Delta.
马士磊;陈雨清;张慧峰;高亮;张金波;迮振荣
水利部太湖流域管理局苏州管理局,215004,苏州水利部太湖流域管理局苏州管理局,215004,苏州水利部太湖流域管理局苏州管理局,215004,苏州江苏省洪泽湖水利工程管理处,223100,淮安江苏省输配电装备技术重点实验室,213022,常州||河海大学人工智能与自动化学院,213022,常州水利部太湖流域管理局苏州管理局,215004,苏州
建筑与水利
闸泵联合调度运行近域耦合系统控制运用边界太浦闸太浦河泵站
sluice-pump joint operation and dispatchingnear-field coupled systemboundary for control and operationTaipu River SluiceTaipu River Pumping Station
《中国水利》 2026 (18)
39-49,11