暴雨洪水下中小型水库致灾因素与风险防控对策OA
Disaster-causing factors and risk control measures for small and medium-sized reservoirs under rainstorm floods
传统单因素统计分析方法难以充分揭示多种致灾因素共同作用下的溃坝模式.为识别暴雨条件下中小型水库的主要致灾因素及其典型组合,系统梳理了我国1954年至今3562个溃坝案例,中小型水库占99.94%,土石坝占94.33%,洪水漫顶和工程质量缺陷分别占51.09%和37.20%.在此基础上,选取51个中小型水库溃坝案例和19个出险未溃案例作为样本.从工程特征、防洪能力、病害隐患、运行管理及应急处置等方面筛选出15项因素,构建分析指标体系.采用描述性统计和Apriori关联规则相结合的方法,分析各因素的分布特征及其与险情结果的组合关系.结果表明,漫顶溃坝主要与坝型、坝高、所处历史阶段、水文监测预报及泄洪能力等因素及其组合相关;渗透破坏溃坝则更多涉及工程质量、所处历史阶段、是否除险加固、泄洪能力及人为操作等因素.出险未溃样本中,低坝和科学应急处置组合占47.37%,表明应急处置水平是决定险情向溃坝演化还是可控处置的关键因素.基于案例致灾过程,构建漫顶型和渗透破坏型两类典型溃坝模式失事路径,据此提出分类防控措施,可为老旧水库改造提升、除险加固等工作提供参考.
Traditional single-factor statistical analysis methods can hardly fully reveal the dam breach modes caused by the combined action of multiple disaster-causing factors.To identify the major disaster-causing factors of small and medium-sized reservoirs and their typical combinations under rainstorm conditions,3562 dam breach cases in China from 1954 to the present were systematically reviewed,in which small and medium-sized reservoirs accounted for 99.94%and earth-rockfill dams for 94.33%of the total,and overtopping and engineering quality defects accounted for 51.09%and 37.20%,respectively.On this basis,51 dam breach cases of small and medium-sized reservoirs and 19 distress cases without dam breach were selected as samples.Fifteen factors were screened out from the aspects of engineering characteristics,flood control capacity,defects and hidden hazards,operation management,and emergency disposal to establish an analysis index system.A method combining descriptive statistics with the Apriori association rule algorithm was adopted to analyze the distribution characteristics of each factor and its combination relationships with the distress outcomes.The results show that overtopping breaches are mainly related to factors and their combinations such as dam type,dam height,historical period,hydrological monitoring and forecasting,and flood discharge capacity,whereas seepage-induced breaches more frequently involve engineering quality,historical period,whether reinforcement was carried out,flood discharge capacity,and human operation.Among the samples that experienced dangerous situations without dam breach,the combination of low dam height and scientific emergency disposal accounted for 47.37%,indicating that the level of emergency disposal is the key factor determining whether a dangerous situation evolves into a dam breach or remains under control.Based on the disaster-causing processes of the cases,two typical failure paths of dam breach modes,namely the overtopping type and the seepage-induced type,were constructed,and classified prevention and control measures were accordingly proposed.This study can serve as a reference for the renovation and upgrading,risk elimination,and reinforcement of aging reservoirs.
高长胜;胡江
水利部 交通运输部 国家能源局南京水利科学研究院,210029,南京水利部 交通运输部 国家能源局南京水利科学研究院,210029,南京||水利部大坝安全管理中心,210029,南京
建筑与水利
暴雨中小型水库溃坝致灾因素关联规则风险防控
rainstormsmall and medium-sized reservoirsdam breachdisaster-causing factorassociation rulerisk prevention and control
《中国水利》 2026 (18)
1-10,10
国家重点研发计划项目(2024YFC3210700)国家自然科学基金项目(U2443229).
评论