高速列车牵引供电能量传输及系统防护研究综述OA
Review on Energy Transmission and System Protection for Traction Power Supply of High-Speed Trains
牵引供电系统是高速铁路能量供给的核心,其能量传输与防护技术直接关系到列车的运行安全与服役性能,从弓网受流、接地回流及过电压防护 3个维度,系统综述了高速铁路牵引供电能量传输及系统防护研究进展.弓网受流方面,分析弓网电弧特性与演化机理,探讨复杂环境对弓网电弧行为及受电弓碳滑板烧蚀的影响,总结弓网结构优化与接触界面调控等防治方法.接地回流方面,阐述"车-轨"接地回流的电路耦合、电磁感应耦合机理,分析接地电流对轴承和钢轨的电蚀危害,归纳接地电流与接地电位的优化抑制策略.过电压防护方面,梳理操作过电压、弓网燃弧过电压、轮轨滚动燃弧过电压和雷击过电压的产生机理,分析过电压对牵引变压器一、二次侧设备及车载传感器的危害,总结针对不同类型过电压的抑制方法及设备终端防护措施.最后,对当前研究存在的不足进行了总结,提出未来应聚焦弓网电弧源头抑制、接地系统仿真优化、过电压多级协同防护,结合数字孪生与智能监测技术,提升牵引供电能量传输的安全性与可靠性.
The traction power supply system is the core of energy supply for high-speed railway,and its energy transmission and protection technologies are directly related to train operational safety and service performance.The research progress of energy transmission and system protection for traction power supply of high-speed railway was reviewed systematically from three perspectives:pantograph-catenary current collection,ground return current,and overvoltage protection.In terms of pantograph-catenary current collection,the characteristics and evolution mechanisms of the pantograph-catenary arc were analyzed,the effects of complex environments on pantograph-catenary arc behavior and pantograph carbon contact strip ablation were discussed,and prevention methods such as pantograph-catenary structural optimization and contact interface regulation were summarized.Regarding ground return current,the circuit coupling and electromagnetic induction coupling mechanisms of the"train-rail"ground return current were elaborated.The electrical erosion hazards of ground current on bearings and rails were analyzed,and optimization and suppression strategies for ground current and ground potential were summarized.In terms of overvoltage protection,the generation mechanisms of switching overvoltage,pantograph-catenary arcing overvoltage,wheel-rail rolling arcing overvoltage,and lightning overvoltage were reviewed,the effects of overvoltage on primary-and secondary-side equipment of traction transformers and on-board sensors were analyzed,and suppression methods for different types of overvoltage as well as protective measures for equipment terminals were summarized.Finally,the shortcomings of current research were summarized,and it was proposed that future research should focus on source-side suppression of pantograph-catenary arcs,simulation-based optimization of grounding systems,and multi-level coordinated protection against overvoltage.Combined with digital twin and intelligent monitoring technologies,the safety and reliability of energy transmission for traction power supply can be improved.
吴广宁;杨晨光;曹野;郭裕钧;肖嵩;谢杰;张华志;高国强
西南交通大学电气工程学院,四川 成都 611756西南交通大学电气工程学院,四川 成都 611756西南交通大学电气工程学院,四川 成都 611756西南交通大学电气工程学院,四川 成都 611756西南交通大学电气工程学院,四川 成都 611756中铁第四勘察设计院集团有限公司,湖北 武汉 430063中铁第四勘察设计院集团有限公司,湖北 武汉 430063西南交通大学电气工程学院,四川 成都 611756
交通工程
高速铁路牵引供电系统能量传输弓网受流接地回流过电压
high-speed railwaytraction power supply systemenergy transmissionpantograph-catenary current collectionground return currentovervoltage
《西南交通大学学报》 2026 (5)
1431-1453,23
国家自然科学基金项目(U24A20153,U2568204,52277165,52277166)