针对东滩煤矿 63上02运顺半煤岩巷道煤岩软硬突变、割岩占比高引发的载荷振动波动大、粉尘浓度高问题,构建掘锚一体化成套装备与智能控制协同的快速掘进技术体系.以煤岩识别为判据,驱动模糊自适应牵引调速与规划截割,实现限载稳切与断面稳定成型;装运侧基于工况边界与装载压力反馈实施按需调速,降低轻载高速磨损;建立多源健康指标融合的状态评估与预警机制,采用在线监测-阈值报警-喷雾联动实现降尘闭环控制.现场工业性试验表明,月平均进尺由 365 m提升至 690 m,提升幅度达 89%;单班用工由 15人降至 8人;迎头全尘浓度下降 40%~50%,呼吸性粉尘浓度下降 35%~45%,可为半煤岩巷道快速、少人、安全掘进提供技术支撑.
In view of the problems of large fluctuations in load and vibration and high dust concentration caused by sudden changes in coal rock hardness and high rock cutting proportion of the 63upper02 transportation crossheading semi coal rock roadway in Dongtan Coal Mine,a rapid excavation technology system combining complete set of equipment of excavation and anchoring integration and intelligent control coordination is constructed.Taking coal rock identification as a criterion,fuzzy adaptive traction speed regulation and planning cutting are drived to achieve load limited stable cutting and cross-section stable forming;On the shipping side,on-demand speed regulation is implemented based on working condition boundaries and loading pressure feedback to reduce high-speed wear under light loads;The state evaluation and early warning mechanism integrating multi-source health indicators is established,and the dust reduction closed-loop control is achieved by adopting online monitoring-threshold alarm-spray linkage.The on-site industrial tests show that the monthly average footage is improved from 365 m to 690 m,with an improvement amplitude of 89%;Single shift employment is reduced from 15 to 8 people;The total head-on dust concentration is decreased by 40%-50%and the respiratory dust concentration is decreased by 35%-45%,which can provide a technical support for rapid,fewer personnel,and safe excavation of semi coal rock roadways.
郭省;唐道增;刘豹
兖矿能源集团股份有限公司东滩煤矿,山东 济宁 273500兖矿能源集团股份有限公司东滩煤矿,山东 济宁 273500兖矿能源集团股份有限公司东滩煤矿,山东 济宁 273500
矿业与冶金
半煤岩巷道掘锚一体机智能化
semi-coal-rockroadwayexcavation and anchoring integrated machineintelligentization
《山东煤炭科技》 2026 (9)
53-59,7