大型矿井多煤层分阶段配采开拓优化设计OA
Optimization Design for Staged Matching Mining and Development of Multiple Coal Seams in Large-scale Mines
针对大型矿井井田范围大、煤层数量多、资源分布不均匀等技术难题,以唐安煤矿下组煤延深(配采)项目作为研究背景,通过分析矿井现有生产系统存在的不足和下组煤的资源条件,经开拓方案技术、经济比选,最终确定下组煤采用新建"2号副斜井、2号回风立井+延深主斜井+胶带暗斜井"开拓布置方案.同时,在科学分析矿井 3号、9号、15号煤层资源条件、分布规律、生产能力和服务年限等因素条件下,通过优化开拓方案布置和系统能力,将三层煤共划分为三个阶段进行配采生产,满足矿井 1.80 Mt/a的产量要求,实现多煤层"分层、分区、独立系统"的配采格局,保证矿井安全高效、绿色环保生产.
In view of the difficult technical problems such as large well field range,numerous coal seams,uneven resource distribution and others in large-scale mines,taking the lower coal group deepening(matching mining)project in Tang'an Coal Mine as the research background.By analyzing the existing limitations of the mine production system and the resource conditions of the lower coal group,and through technical and economic comparison and selection of development schemes,it is finally determined that the lower coal group adopts a newly built"No.2 auxiliary inclined shaft,No.2 return air vertical shaft+deepening main inclined shaft+tape subinclined shaft"development layout scheme.Meanwhile,under the condition of scientifically analyzing factors such as resource conditions,distribution laws,production capability,service life and others of No.3,9,and 15 coal seams in the mine,by optimizing the development scheme layout and system capabilities,the three coal seams are divided into three stages for matching mining and production,meeting the production requirements of 1.8 Mt/a in the mine,achieving a"layered,partitioned,and independent system"matching mining pattern for multiple coal seams,and ensuring safe,efficient,green and environmentally friendly production in the mine.
上官鹏远;段文超
晋能控股集团天安公司苇町煤业,山西 晋城 048000山西晋城煤业集团勘察设计院有限公司,山西 晋城 048006
矿业与冶金
下组煤延深开拓优化
lower coal groupdeepeningdevelopmentoptimization
《山东煤炭科技》 2026 (9)
37-45,9