国内煤矿开采深度持续增加、单井生产规模不断扩大,导致井架设计高度提升、提升容器增大、功能日趋复杂,随着大直径井筒冻结法施工普及,湿陷性黄土与软岩地基的冻融特性加剧地基与基础设计难度,井架选址面临的地质条件愈发复杂.针对大提升荷载、大提升高度、复杂地基条件下的井架设计需求,以胡家河煤矿二号进风立井井架为工程依托,开展双斜撑式钢井架结构设计研究.通过对比不同支撑方案优缺点,确定合理支撑方式;分析材料对井架各项指标的影响,选定适配材质;结合工程特殊地基条件,确定针对性地基处理方式,为同类复杂地质条件下的大规格钢井架结构设计提供技术参考.

The mining depth of domestic coal mines continues to increase,and the production scale of single wells continues to expand.The design height of the headframe has been raised,the hoisting container was increased,and the functions have become increasingly complex.With the popularization of large-diameter wellbore freezing method construction,the difficulty of foundation design is intensified by the freeze-thaw characteristics of collapsible loess and soft rock foundation,and the geological conditions faced by headframe site selection have become increasingly complex.Aiming at the headframe design requirements under the conditions of high hoisting load,high hoisting height and complex foundation,taking the No.2 air intake vertical shaft headframe of Hujiahe Coal Mine as the engineering basis,design research on double diagonal braced steel headframe structures is carried out.By comparing the advantages and disadvantages of different support schemes,a reasonable support method is determined;The influence of materials on various indicators of the headframe is analyzed,and suitable materials are selected;Combined with the special foundation conditions of the engineering,a targeted foundation treatment method is determined,which provides a technical reference for the design of large-scale steel headframe structures under similar complex geological conditions.

田亚珍;王玮

中煤西安设计工程有限责任公司,陕西 西安 710054中煤西安设计工程有限责任公司,陕西 西安 710054

矿业与冶金

井架支撑地基优化

headframebracingfoundationoptimization

《山东煤炭科技》 2026 (9)

19-23,30,6

10.3969/j.issn.1005-2801.2026.09.004