首页|期刊导航|人民长江|流域水风光一体化基地容量配置规律研究

流域水风光一体化基地容量配置规律研究OA

Research on capacity configuration regularity of hydro-wind-solar integrated bases

中文摘要英文摘要

水风光一体化开发是提高流域清洁能源消纳水平的重要途径,科学确定容量配置方案是实现项目技术可行性与经济性的关键前提.为揭示水风光互补系统经济效益与装机规模之间的平衡规律,构建了可灵活切换优化目标(风光年净利润最大化或装机规模最大化)的容量配置优化模型,该模型综合考虑了发电收益、投资成本与技术性运行成本.以金沙江下游乌东德、白鹤滩、溪洛渡水电站为对象,在水电不新增弃水的互补原则下,系统分析了风光配比、输电通道容量、弃电率约束及送电曲线等多维度因素对容量配置方案的影响.结果表明:① 水风光互补系统的利润函数在峰值附近并非孤立极值点,而是呈现由多个"风光配比+装机规模"组合构成的"近似最优解集"平台,解集内各方案年净利润与全局最优值的差异小于3%,解集的宽窄与纯水电对通道的占用程度密切相关,纯水电利用小时数越低、通道裕度越大,解集越宽;② 新能源弃电率约束放宽可线性提升可配置规模,但风光净利润呈先升后降的单峰或双峰特征,存在使经济效益最优的"经济弃电率",其取值因风光资源特性和系统约束而异,平水年乌东德水电站约为10%~15%(单峰),白鹤滩水电站约为20%(单峰),溪洛渡水电站呈双峰特征(峰值分别位于5%和20%左右);③ 输电通道容量设置为水电装机的1.0,1.5,2.0 倍时,可配置新能源规模与输电通道容量的比值始终在1.34~1.69 之间,均值约 1.5.研究成果可为基地规划初期的快速匡算评估提供简易实用的量化参考.

Integrated hydro-wind-solar development represents a critical pathway to enhance basin-scale clean energy ac-commodation,and scientifically determining the capacity configuration scheme is a key prerequisite for achieving both technical feasibility and economic viability.To reveal the balance between economic benefits and installed capacity in hydro-wind-solar complementary systems,this study develops a capacity configuration optimization model with flexibly switchable objectives:maxi-mizing either the annual net profit of wind and solar power or the total installed capacity;the model comprehensively considers generation revenue,investment costs,and technical operation expenses.Focusing on the Wudongde,Baihetan,and Xiluodu Hydro-power Plants in the lower Jinsha River,and following the complementarity principle of no additional hydropower curtailment,the influences of multiple factors on capacity configuration schemes are systematically analyzed,including the wind-solar capacity ra-tio,transmission corridor capacity,curtailment rate constraint,and power delivery curve.The results show that:① the profit func-tion of the hydro-wind-solar complementary system does not peak at an isolated optimum point;instead,it forms a plateau re-gion defined as the"Approximate Optimal Solution Set"(AOSS),containing multiple combinations of wind-solar ratio and in-stalled capacity.Within this set,the annual net profit of each scheme deviates from the global optimum by less than 3%.The width of the set is closely correlated with the degree of corridor occupancy by hydropower alone:the lower the hydropower-only utilization hours and the greater the corridor margin,the wider the set.② Relaxing the renewable energy curtailment rate con-straint increases the configurable capacity linearly.Nevertheless,the net profit of wind and solar power rises first and then de-clines,exhibiting a unimodal or bimodal pattern.An"economic curtailment rate"exsists to maximize economic benefits,and its value varies with wind-solar resource characteristics and system constraints.For Wudongde in a normal water year(unimodal),this rate is approximately 10%~15%,it is approximately 20% for Baihetan(unimodal),and Xiluodu presents a bimodal distri-bution with peaks at approximately 5% and 20%.③ When the transmission corridor capacity is 1.0,1.5,and 2.0 times as much as the hydropower installed capacity,the ratio of the configurable renewable energy capacity to the corridor capacity consistently ranges from 1.34 to 1.69,with a mean of approximately 1.5.These findings provide a simple and practical quantitative reference for rapid estimation in the preliminary planning of hydro-wind-solar integrated bases.

曹辉;严凌志;徐杨;杨钰琪;王进;刘冠君

中国长江电力股份有限公司,湖北 宜昌 443002||智慧长江与水电科学湖北省重点实验室,湖北 宜昌 443002长江勘测规划设计研究有限责任公司,湖北 武汉 430010中国长江电力股份有限公司,湖北 宜昌 443002||智慧长江与水电科学湖北省重点实验室,湖北 宜昌 443002中国长江电力股份有限公司,湖北 宜昌 443002||智慧长江与水电科学湖北省重点实验室,湖北 宜昌 443002中国长江电力股份有限公司,湖北 宜昌 443002||智慧长江与水电科学湖北省重点实验室,湖北 宜昌 443002中国长江电力股份有限公司,湖北 宜昌 443002||智慧长江与水电科学湖北省重点实验室,湖北 宜昌 443002

建筑与水利

水风光互补容量配置输电通道近似最优解集经济弃电率金沙江下游

hydro-wind-solar complementaritycapacity configurationtransmission lineapproximate optimal solution seteconomic curtailment ratelower Jinsha River

《人民长江》 2026 (9)

48-59,12

中国长江电力股份有限公司项目(Z242302023)中国博士后科学基金第76批面上资助项目(2024M762780)

10.16232/j.cnki.1001-4179.2026.09.006

评论