流域水风光一体化运行协同效益对比分析方法OA
Comparatively analyzing synergistic benefits of hydro-wind-solar integrated power stations
流域水风光一体化是中国西南省份电网面临的全新调度形态,但由于水风光出力波动性、水电调节能力季节性变化及水调与电调边界的复杂耦合,其协同效益优势难以准确研判,导致新型调度体制机制探索缺乏依据.明确水风光一体化协同运行与非协同运行的内涵与区别;综合考虑资源利用、电量消纳、通道送出和负荷响应等多维要求,构建水风光一体化运行效益评价指标体系;面向长中短期调度业务需求,建立了水风光一体化协同与非协同多时间尺度优化仿真调度模型,并采用混合整数线性化建模技术处理复杂非凸非线性约束,实现模型高效求解;以西南某流域 L、Y、J 三个差异化水风光一体化项目群为工程案例,详细对比分析了差异化项目群在长中短期、丰枯来水场景下协同与非协同的运行效益结果,并据此制定了水风光一体化调度方式优选图谱.结果表明:外送通道容量充裕时,一体化协同与非协同无明显差异;通道容量受限时,一体化协同运行优势明显,通过发挥水库调蓄能力实现水电电量时序转移,可为新能源让出通道,减少因外送通道阻塞导致的弃电.研究成果可为流域水风光一体化调度业务体系构建提供参考.
Hydro-wind-solar integration represents an innovative dispatching paradigm for power grids in southwestern prov-inces of China.However,owing to the volatility of hydro-wind-solar power outputs,seasonal variations in hydropower regulation capacity,and the complex coupling between water regulation and power dispatching boundaries,the synergistic benefits of such in-tegration are difficult to accurately assess,leaving the exploration of new dispatching mechanisms without a solid foundation.This paper first clarifies the definitions and differences between synergistic and non-synergistic operation of hydro-wind-solar com-plementary operation.A benefit indicator system for integrated operation is constructed by considering multiple requirements:re-source utilization,electricity accommodation,transmission capacity,and load response.Second,multi-timescale optimization sim-ulation models for synergistic and non-synergistic operation are established to meet the needs of long,medium,and short-term dispatching.Mixed-integer linear programming(MILP)is adopted to handle complex non-convex and nonlinear constraints and enable efficient model solving.Finally,three differentiated integrated hydro-wind-solar project clusters,denoted as L,Y,and J,in a river basin in southwestern China are selected as engineering case studies.The operational benefits of synergistic and non-synergistic operation are compared in detail under long,medium,and short timescales as well as wet and dry inflow scenari-os.A preference atlas of hydro-wind-solar integration is formulated based on the simulation outcomes.The results reveal that no substantial benefit gap exists between synergistic and non-synergistic operation when transmission channel capacity is sufficient;however,prominent synergistic gains emerge under constrained transmission capacity.By utilizing reservoir storage to shift hydro-power electricity over time,transmission channel capacity can be reserved for new energy sources,thereby reducing new energy curtailment induced by transmission congestion.The results can provide a reference for developing dispatching systems for water-shed-scale hydro-wind-solar integration.
张俊涛;霍志硕;王亚华;李红刚;倪旺丹;张祺顺;程春田
大连理工大学 建设工程学院,辽宁 大连 116024大连理工大学 建设工程学院,辽宁 大连 116024雅砻江流域水电开发有限公司,四川 成都 610056华能澜沧江水电股份有限公司,云南 昆明 650214||云南省水风光一体化工程技术创新中心,云南 昆明 650214华能澜沧江水电股份有限公司,云南 昆明 650214||云南省水风光一体化工程技术创新中心,云南 昆明 650214华能澜沧江水电股份有限公司,云南 昆明 650214||云南省水风光一体化工程技术创新中心,云南 昆明 650214大连理工大学 建设工程学院,辽宁 大连 116024
建筑与水利
水风光一体化协同运行效益分析调度方式图谱
hydro-wind-solar integrationsynergistic operationbenefit analysisdispatching mode atlas
《人民长江》 2026 (9)
37-47,59,12
国家自然科学基金青年基金项目(52409010)中国华能有限集团科技项目(HNKJ25-H17)
评论