首页|期刊导航|人民长江|基于混合分水方案的水库群联合供水优化调度规则

基于混合分水方案的水库群联合供水优化调度规则OA

Research on joint water supply optimal operation rules for multi-reservoir system under mixed water allocation scheme

中文摘要英文摘要

在聚合-分解框架下,可将水库群联合供水调度规则等效为聚合水库供水调度规则及共同供水任务分配方法.针对传统动态分水比例系数法未能考虑水库库容补偿作用,易产生弃水,而补偿调节法可能由于过度补偿而影响自身供水户供水的问题,提出"动态分水比例系数"及"补偿调节"方法结合的混合分水方案,并利用参数化-模拟-优化方法,构建水库群联合抗旱优化调度模型,嵌套"聚合-分解"方法降维求解.以云南省楚雄州青山嘴水库和九龙甸水库联合供水为例开展了联合供水研究.研究结果表明:在所提规则指导下,通过连枯水年前期主动限制供水,避免了供水优先级高的重要用水户严重缺水;相较动态分水比例系数法,所提混合分水方案通过发挥水库间补偿作用,在连枯水年减少弃水 815 万 m3,降低农业最大缺水率1.3%.所提水库群联合供水调度规则可为水库群联合供水调度抗旱减灾提供参考.

The joint water supply operation rules for multi-reservoir systems play a critical role in mitigating drought-induced water scarcity risks.Within an aggregation-decomposition framework,the rule can be equated to the operation rules of an aggre-gated equivalent reservoir and the allocation approach for shared water supply tasks.The allocation method for shared supply tasks,which significantly influences the spatial-temporal distribution of water resources and the realization of compensatory effects among reservoirs,constitutes a key and complex challenge in joint operation.The dynamic water allocation ratio method ig-nores storage compensation between reservoirs and lead to unnecessary spillage,whereas the compensation regulation method may jeopardize supply for a reservoir's own users due to its over-compensation.To address the limitations of conventional approaches,this paper proposes a hybrid water allocation scheme that integrates both dynamic water allocation ratios and the compensation reg-ulation method.A joint optimal drought-resistantance operation model for the reservoir system is developed using a parameteriza-tion-simulation-optimization modeling framework,achieving dimensionality reduction.Application of the proposed method to the joint water supply system of the Qingshanzui and Jiulongdian reservoirs in Chuxiong Prefecture,Yunnan Province,demonstrates that:under the guidance of the proposed rule,proactive water supply restriction in the early stages of consecutive dry years pre-vents severe water shortages for high-priority users.Compared with the dynamic water allocation ratio method,the proposed hy-brid scheme,by leveraging inter-reservoir compensation,reduces spillage by 8.15 million cubic meters during consecutive dry years and lowers the maximum agricultural water shortage rate by 1.3%during long-term operation.The proposed joint water supply operation rules are scientifically sound and provide technical support for water authorities in guiding reservoir system opera-tion for drought mitigation and disaster reduction.

罗成鑫;吴厚发

长江勘测规划设计研究有限责任公司,湖北 武汉 430010||流域水安全保障湖北省重点实验室,湖北 武汉 430010长江勘测规划设计研究有限责任公司,湖北 武汉 430010||流域水安全保障湖北省重点实验室,湖北 武汉 430010

建筑与水利

水库群联合调度供水优化调度共同供水任务调度规则

multi-reservoir systemjoint operationoptimal water supply operationjoint water supply tasksoperation rule

《人民长江》 2026 (9)

13-19,36,8

国家重点研发计划项目(2024YFC3012302)长江勘测规划设计研究有限责任公司科研项目(CX2021Z03)

10.16232/j.cnki.1001-4179.2026.09.002

评论