流化床高温颗粒储热协同燃煤热电机组解耦深调运行研究OA
Research on decoupling and deep peak-shaving operation of a coal-fired thermal power unit with fluidized bed high-temperature particle thermal storage and collaborative combustion
[目的]针对"双碳"目标和高比例可再生能源并网背景下,燃煤热电联产机组在采暖季调峰灵活性受限的问题,提出一种基于流化床高温颗粒储热的热电解耦方案,旨在提升机组电、热负荷调节能力与供热保障水平.[方法]以某 315 MW亚临界燃煤机组为研究对象,基于 Ebsilon 软件构建集成流化床高温颗粒储热系统的热力学仿真模型.该系统采用"低谷储电、高峰供热"运行模式,通过量化额外供热标准抽汽流量、供热安全区等关键指标,分析耦合储热系统前、后机组的供热解耦能力和调峰解耦能力变化,并选取典型高比例可再生能源日场景进行电-热协同匹配验证.[结果]仿真结果表明,耦合储热系统后,机组供热安全区显著扩大,低负荷下的供热能力与高供热需求下的调峰能力有效增强.在典型日场景中,系统能够使机组更好地响应电网负荷波动,同时大幅提升热负荷匹配度.[结论]流化床高温颗粒储热技术可以有效实现燃煤热电联产机组的热电解耦,显著提升机组运行灵活性与供热保障能力,为机组灵活性改造及促进可再生能源消纳提供可行路径.
[Objective]Under the"dual-carbon"strategic targets and the accelerating integration of high-proportion renewable energy into the grid,coal-fired cogeneration units face increasingly severe challenges in operational flexibility,especially during the heating season.Such units are typically constrained by the"heat-led-electricity"mode,where the minimum power output is dictated by the heating demand,severely limiting their ability to participate in peak-shaving and accommodate intermittent renewables like wind and solar.To address this issue,this study proposes a thermoelectric decoupling scheme based on a fluidized-bed high-temperature particle thermal energy storage(TES)system.The aim is to decouple the traditionally coupled electricity and heat outputs,thereby enhancing the independent regulation capability of both electric and thermal loads while ensuring reliable district heating supply.[Methods]A 315 MW subcritical coal-fired cogeneration unit is taken as the research object.A steady-state thermodynamic model integrating the power unit with a fluidized-bed particle TES system is developed using the professional simulation software Ebsilon.The TES system operates on a"store electricity during off-peak,supply heat during peak demand"strategy.During periods of low grid load or high renewable generation,surplus electrical energy is converted into thermal energy by heating quartz-sand particles to 800℃in a fluidized-bed electric heater;the hot particles are then stored in an insulated tank.During peak power demand or high heating requirement,the stored thermal energy is released via a fluidized-bed heat exchanger to heat the district-water return flow,thereby supplying additional heat without extracting more steam from the turbine.Key performance indicators,including the equivalent additional extraction steam flow(ΔDmax),the heating safety zone,the heat-supply decoupling capacity,and the peak-shaving decoupling capacity,are defined and quantified to evaluate the system's decoupling performance.Furthermore,a typical winter day scenario with high renewable energy penetration is constructed to assess the practical electricity-heat coordinated operation capability.[Results]Simulation results demonstrate that the integration of the fluidized-bed TES system significantly expands the operational heating safety zone of the unit.The system provides an equivalent additional extraction steam flow of 15.62 t/h during the heat storage process and 96.33 t/h during the heat release process.This enhancement substantially improves the unit's heat-supply decoupling capacity under low-load conditions and increases its peak-shaving range when the heating demand is high.In the typical high-renewables day scenario,the coupled system enables the unit to better follow the fluctuating grid load instructions while maintaining the required heating supply.The mismatch between the actual heat load and the unit's heating capability is significantly reduced compared with the original operation.[Conclusion]The fluidized-bed high-temperature particle TES technology can effectively achieve thermoelectric decoupling in coal-fired cogeneration units,significantly enhancing the flexibility and heating assurance.It offers a feasible pathway for flexibility retrofitting of existing units and for promoting the accommodation of renewable energy.
陈灏丹;张亦菲;李文涵;张海;张扬
清华大学能源与动力工程系,热科学与动力工程教育部重点实验室,北京 100084清华大学能源与动力工程系,热科学与动力工程教育部重点实验室,北京 100084清华大学能源与动力工程系,热科学与动力工程教育部重点实验室,北京 100084清华大学能源与动力工程系,热科学与动力工程教育部重点实验室,北京 100084清华大学能源与动力工程系,热科学与动力工程教育部重点实验室,北京 100084||清华大学山西清洁能源研究院,山西 太原 030032
燃煤机组高温颗粒储热流化床热电解耦灵活性供热安全
coal-fired power unithigh-temperature particle heat storagefluidized bedthermoelectric decouplingflexibilityheating safety
《热力发电》 2026 (9)
84-91,8
科技部国家重点研发计划政府间国际科技创新合作专项(2022YFE0117700) National Key Research and Development Project of Ministry of Science and Technology of China(2022YFE0117700)