面向极端灾害的配电网储能弹性规划优化模型OA
Optimization Model for Energy Storage Planning to Enhance Distribution Network Resilience Against Extreme Disasters
针对台风、洪涝等极端灾害的成灾场景和特征,以储能规划成本和负荷损失成本最小化为目标函数,利用鲁棒优化机制,考虑灾中各个时段负荷的不确定性影响,构建了一种基于两阶段鲁棒优化的受灾孤岛配电网储能电站弹性规划模型.第一决策阶段优化确定储能的选址定容问题,第二决策阶段优化确定储能的输出功率的调控量和负荷的削减量.采用列和约束生成算法(C&CG)对该优化问题进行迭代求解,获得了非常好的效果.以IEEE-33节点系统为算例进行仿真计算,数据分析表明,相比确定性优化,所提的鲁棒优化规划模型既能兼顾负荷预测的不确定性,又能保证灾中关键负荷的可靠供电,综合提高配电网的弹性.
Aiming at the disaster scenarios and characteristics of extreme disasters such as typhoons and floods,a two-stage robust optimization based elastic planning model for energy storage power stations in disaster isolated island distribution networks is constructed utilizing robust optimization mechanisms with the objective function of minimizing energy storage planning costs and load loss costs,and considering the uncertainty of loads at various times during disasters.In the first decision-making stage,the problem of optimizing the location and capacity of energy storage is determined,and in the second decision-making stage,the regulation of the output power of energy storage and the reduction of load are optimized and determined.The column and constraint generation algorithm(C&CG)was used to iteratively solve the optimization problem and achieved very good results.Taking IEEE-33 system as an example for simulation calculation,data analysis shows that compared to deterministic optimization,the robust optimization planning model proposed in this paper can not only consider the uncertainty of load forecasting,but also ensure the reliable power supply of critical loads during disasters,comprehensively improving the resilience of the distribution network.
李德祥;罗世坚;孙会洁;罗天禄
广西电网有限责任公司南宁供电局,广西壮族自治区 南宁市 530029广西电网有限责任公司南宁供电局,广西壮族自治区 南宁市 530029广西电网有限责任公司南宁供电局,广西壮族自治区 南宁市 530029广西电网有限责任公司,广西壮族自治区 南宁市 530031
信息技术与安全科学
极端灾害配电网储能电站弹性规划两阶段鲁棒优化
extreme disastersdistribution networkenergy storage power stationselastic planningtwo-stage robust optimization