京沪高铁桥墩加固基坑开挖安全监测与水利监管要点研究OA
Research on key points of safety monitoring and water conservancy supervision for foundation pit excavation in bridge pier reinforcement of Beijing-Shanghai High-Speed Railway
以常州新孟河延伸拓浚工程新北段穿越京沪高铁项目为研究背景,系统分析运营高铁桥下大面积超深卸载基坑施工的安全监测技术与水利安全监管要点.研究表明,采用"分层开挖、随挖随撑、对称施工、严禁超挖"的施工原则,结合自动化监测系统实时监控,可有效减少施工扰动,确保施工期高铁运行安全.从水利工程安全监管视角,梳理深基坑工程的监测体系构建、监管要点、预警机制及应急处置等关键环节,为类似涉铁水利工程的安全监管提供可推广的技术参考.
In recent years,China's water infrastructure development has entered a phase of rapid growth,with increasing intersections between major water projects and high-speed railway networks.This study examines the Xinbei section of the Changzhou Xinmeng River Extension and Deepening Project traversing the Beijing-Shanghai High-Speed Railway,systematically analyzing safety monitoring technologies and key aspects of water conservancy supervision for large-scale ultra-deep unloading foundation pit construction beneath operational high-speed rail lines.The research demonstrates that adopting construction principles—including layered excavation,real-time support during excavation,symmetrical construction practices,and strict prohibition of over-excavation—combined with real-time monitoring through automated systems,can significantly reduce construction disturbances and ensure safe rail operations during construction periods.From a water conservancy project safety supervision perspective,this paper outlines the construction of monitoring systems,key supervision points,early warning mechanisms,and emergency response protocols for deep foundation pit engineering,providing replicable technical references for the safety supervision of similar railway-related water conservancy projects.
石超磊
常州市河道湖泊管理处,江苏 常州 213000
建筑与水利
京沪高铁桥墩加固基坑开挖安全监测水利监管
Beijing-Shanghai High-Speed Railwaybridge pier reinforcementfoundation pit excavationsafety monitoringwater conservancy supervision
《江苏水利》 2026 (10)
26-30,5