伯岗节制闸除险加固设计方案分析OA
Analysis on the Reinforcement Design Scheme for Bogang Regulating Sluice
蒋河伯岗节制闸为中型节制闸,其除险加固设计方案根据复核的水文资料及防洪标准,拆除原节制闸,在原闸址处重建.通过对6孔和8孔两种节制闸设计方案的优缺点进行比选,最终确定采用开敞式整体式钢筋混凝土结构,露顶式平板钢闸门,手电两用卷扬式启闭设备.通过水力计算并根据河道设计断面、现有断面,确定闸孔宽度及上下游连接段、护坡,闸室上部设启闭机房,闸室两端设桥头堡与启闭机房连通.
The Jianghe Bogang Regulating Sluice is a medium-sized regulating sluice.The design plan for its hazard mitigation and reinforcement is developed based on reviewed hydrological data and flood control standards,involving the demolition of the original sluice and reconstruction at the original site.A comparative study is carried out on the advantages and disadvantages of two design alternatives with six sluice bays and eightsluice bays respectively.Finally,an open-type monolithic reinforced concrete structure with an exposed top steel gate and manual-electric dual-purpose hoisting equipment is adopted.Through hydraulic calculation results and considering both the designed river cross-section and existing conditions,the width of sluice openings,upstream-downstream connecting sections,and slope protection measures are determined.A hoist house is arranged on the upper part of the sluice chamber,and bridge towers at both ends of the sluice chamber are connected to the hoist house.
牛馨伟
商丘兴水勘测设计有限公司,河南 商丘 476000
建筑与水利
节制闸方案比选主要建筑物设计水力计算
Regulation GateAlternative Design ComparisonMain Structure DesignHydrological Calculations
《河南水利与南水北调》 2026 (8)
15-16,2
评论