首页|期刊导航|电力科技与环保|相变材料储热系统对大型火电机组调峰性能影响的研究

相变材料储热系统对大型火电机组调峰性能影响的研究OA

Study on the impact of phase change material thermal storage systems on peak-shaving performance of large thermal power units

中文摘要英文摘要

[目的]为提升大型火电机组的调峰灵活性与电网负荷响应能力,解决高比例新能源并网下传统燃煤机组深度调峰能力不足的问题,以某1 000 MW超超临界燃煤机组为对象,探索高温相变储热系统与机组热力循环的深度融合路径.[方法]基于EBSILON Professional 17.0仿真平台,构建机组-相变储热耦合热力模型,选用Al-12Si共晶合金为储热介质.储热阶段设计3种抽汽方案(A:主蒸汽;B:再热蒸汽;C:主+再热蒸汽),释热阶段设计3种回热路径(a:除氧水至低压缸入口;b:3号高加入口→1号高加出口;c:3号低加入口→1号高加出口),组合成9种耦合方案,从调峰容量、热效率、标准煤耗、烟效率及往返效率等维度进行综合对比.[结果]结果表明,A-b方案综合性能最优:在90 MW储-释热负荷下,调峰容量达173.95 MW,烟效率为43.92%,往返效率为50.10%,均优于其他方案,且标准煤耗最低.储热方案中,A方案调峰容量最大;释热方案中,b方案调峰性能与热效率均最优.[结论]合理选取主蒸汽储热与高压回热释热路径,可在保障机组安全运行的前提下,显著拓宽负荷调节区间、提升爬坡速率,为大型火电机组灵活性改造及新能源消纳提供可行的技术路径.

[Objective]To enhance the peak-shaving flexibility and grid load response capability of large-scale thermal power units,and to address the issue of insufficient deep peak-shaving capacity of conventional coal-fired units under high-penetration renewable energy integration,this study explores a deep integration pathway between a high-temperature phase change thermal storage system and the thermodynamic cycle of a 1 000 MW ultra-supercritical coal-fired unit.[Methods]Based on the EBSILON Professional 17.0 simulation platform,a coupled unit-PCM thermal storage thermodynamic model was established with Al-12Si eutectic alloy selected as the thermal storage medium.Three steam extraction schemes were designed for the charging stage(A:main steam;B:reheat steam;C:main+reheat steam),and three heat release paths were designed for the discharging stage(a:deaerated water to low-pressure cylinder inlet;b:No.3 HP heater inlet → No.1 HP heater outlet;c:No.3 LP heater inlet → No.1 HP heater outlet),forming nine coupled schemes.Comprehensive comparisons were conducted from multiple perspectives,including peak-shaving capacity,thermal efficiency,standard coal consumption,exergy efficiency,and round-trip efficiency.[Results]The results indicate that Scheme A-b exhibits the best overall performance:at a 90 MW charging-discharging load,the peak-shaving capacity reaches 173.95 MW,with an exergy efficiency of 43.92%and a round-trip efficiency of 50.10%,all outperforming the other schemes,while achieving the lowest standard coal consumption.Among the charging schemes,Scheme A provides the largest peak-shaving capacity;among the discharging schemes,Scheme b demonstrates the optimal peak-shaving performance and thermal efficiency.[Conclusion]Reasonable selection of main steam thermal storage coupled with high-pressure regenerative heat release paths can significantly broaden the unit's load regulation range and enhance ramp rates under safe operation,offering a feasible technical pathway for flexibility retrofitting of large-scale thermal power units and renewable energy accommodation.

孙小奇;李德波;方立军;金凤雏;薛天华

华北电力大学动力工程系,河北 保定 071003||河北省低碳高效发电技术重点实验室(华北电力大学),河北 保定 071003南方电网电力科技股份有限公司,广东 广州 510080华北电力大学动力工程系,河北 保定 071003||河北省低碳高效发电技术重点实验室(华北电力大学),河北 保定 071003南方电网电力科技股份有限公司,广东 广州 510080南方电网电力科技股份有限公司,广东 广州 510080

能源科技

相变储热火电机组调峰EBSILON仿真高温相变材料

phase change thermal storagethermal power unitspeak shavingebsilon simulationhigh-temperature phase change materials

《电力科技与环保》 2026 (4)

591-601,11

广东省能源产业科技创新项目

10.19944/j.eptep.1674-8069.2026.04.008

评论