双排桩支护结构在复杂环境地段深基坑工程中的应用OA
Application of double-row pile retaining structure in deep foundation pit engineering at complex environment sections
随着城市建设的快速推进,城区建筑密度持续增大、土地资源日趋紧张,城市地下空间开发规模与需求持续增长,新建项目深基坑工程往往紧邻既有建筑物、轨道交通、城市道路和地下管线,施工环境复杂.受既有地下结构的影响,传统桩锚支护体系的锚杆施工不具备作业空间,应用受到限制,而双排桩支护结构在该类复杂环境下的深基坑工程中展现出良好的适用性,成为解决此类工程难题的优选支护方案.以成都某位于复杂环境地段的深基坑双排桩支护结构为例,依托动态支护节点基坑变形监测数据,开展双排桩支护结构变形特性分析,验证其实际工程应用效果.监测结果表明:该基坑的双排桩支护体系中,前排桩桩顶最大水平位移为19.5 mm,最大竖向位移为4.5 mm;基坑周边土体最大竖向沉降值为4.1 mm,邻近既有建筑的最大竖向沉降值仅为2.8 mm,邻近既有建筑角点的最大倾斜率为0.011 9%,所有变形监测指标均在规范允许范围内,体现了双排桩支护结构在侧向刚度、变形控制及空间适应性方面的优势,有效保障了基坑本体与周边环境的安全稳定,为双排桩支护结构在同类复杂环境深基坑工程中的应用提供了参考.
With the rapid advancement of urban construction,the density of buildings in urban areas contin-ues to increase,and land resources are becoming increasingly scarce.The scale and demand for underground space development in cities continue to grow.New construction projects often involve deep foundation pits adjacent to existing buildings,rail transit,urban roads,and underground pipelines,creating complex con-struction environments.Due to the influence of existing underground structures,the anchor rod construc-tion of traditional pile anchor support systems does not have working space and the application is limited.However,the double row pile support structure has shown good applicability in deep foundation pit engi-neering in such complex environments and has become the preferred support solution to solve such engi-neering problems.Taking the double row pile support structure of a deep foundation pit located in a com-plex environmental area in Chengdu as an example,based on the dynamic support node foundation pit de-formation monitoring data,the deformation characteristics of the double row pile support structure were analyzed to verify its actual engineering application effect.The monitoring results show that in the double row pile support system of the foundation pit,the maximum horizontal displacement of the front row pile top is 19.5 mm,and the maximum vertical displacement is 4.5 mm;the maximum vertical settlement value of the soil around the foundation pit is 4.1 mm,and the maximum vertical settlement value of the adjacent existing buildings is only 2.8 mm.The maximum inclination rate of the adjacent existing building corner is 0.011 9%.All deformation monitoring indicators are within the allowable range of the specifications,re-flecting the advantages of the double row pile support structure in lateral stiffness,deformation control,and spatial adaptability,effectively ensuring the safety and stability of the foundation pit body and the sur-rounding environment,and providing reference for the application of the double row pile support structure in similar complex environment deep foundation pit projects.
李建勇;李雷
深圳市工勘岩土集团有限公司四川分公司,四川成都 610081四川林康工程勘察设计有限公司,四川丹巴 626300
建筑与水利
深基坑复杂环境地段双排桩支护动态节点变形监测
deep foundation pitcomplex environmental sectiondouble-row pilesupport dynamic nodede-formation monitoring
《长春工程学院学报(自然科学版)》 2026 (3)
25-32,8
评论