大渡河典型河床深厚覆盖层基坑开挖边坡动态稳定性研究OA
Dynamic stability research on excavation slope of foundation pit in deep overburden of typical Dadu River riverbed
河床坝基深厚覆盖层对水电工程安全建设与运营具有重要影响.本文以大渡河某水电站为研究对象,综合运用理论分析、地质调查、工程勘察、试验测试与数值计算等方法,系统查明了河床深厚覆盖层的空间展布特征与工程特性,深入分析了深厚覆盖层基坑开挖边坡稳定性动态演化规律,圈定了可能存在的潜在失稳破坏范围.研究表明,水电站河床坝基区广泛分布深厚覆盖层,最大厚度达 62.75 m.基坑开挖后形成的深厚覆盖层边坡高度超过 60 m,其变形特征呈"坡腰大、坡顶与坡脚小"的分布规律,最大位移为 31 cm,变形模式主要受开挖卸荷与周围约束双重机制控制.基坑周边深厚覆盖层沉降的水平影响范围约为 70 m.降雨对边坡稳定性影响最为显著,边坡整体稳定性随开挖深度增加呈"快—慢—快"的阶梯式演化特征,上游侧稳定性受砂层透镜体控制,下游侧受开挖坡比影响.现场调查和数值计算结果共同表明,浅层滑动是该深厚覆盖层边坡的主要失稳模式,边坡开挖潜在下滑破坏厚度约 3~7 m.针对临时开挖边坡建议采取"边坡防渗+全断面喷射混凝土封闭"进行支护,并做好工程检测.研究成果可为类似地质条件下深厚覆盖层开挖高边坡风险防控提供重要理论依据.
Deep overburden layers in riverbed dam foundations critically influence the safety of hydropower project construction and operation.This study investigated a hydropower station on the Dadu River by employing integrated methodologies including theoretical analysis,geological surveys,engineering exploration,laboratory testing,and numerical modeling.The spatial distribution patterns and engineering properties of the deep riverbed overburden were systematically characterized,while the dynamic evolution of slope stability during foundation pit excavation through this overburden was deeply analyzed,enabling delineation of potential instability zones.Research outcomes demonstrate extensive overburden development within the riverbed dam foundation,reaching a maximum thickness of 62.75 m.Excavation for the powerhouse monolith section formed slopes exceeding 60 m in height within the overburden,exhibiting a distinct deformation gradient:displacement peaks at the mid-slope and decreases progressively toward both the crest and toe.The maximum displacement recorded reaches 31 cm,a pattern primarily controlled by the combined effects of excavation unloading and lateral confinement.The horizontal influence range of settlement of the deep overburden around the foundation pit is approximately 70 m.Rainfall exerts a dominant control on slope stability,with overall stability exhibiting a three-stage,stepwise evolution("rapid-slow-rapid"decline)as excavation deepens.Stability of the upstream slope is governed by the presence of sand lenses,while the downstream slope is controlled by the excavation gradient.Integrated field and numerical investigations reveal that shallow sliding is the primary failure mode for thick overburden slopes,with a potential sliding depth of 3-7 m.For temporary excavation slopes,it is recommended to adopt a support system combining slope impermeability measures with full-face shotcrete sealing,accompanied by comprehensive engineering monitoring.These findings offer a framework for risk mitigation in similar high cut slopes under analogous geological conditions.
邢江;周洪福;胡锦鹏;刘万林;薛静怡;曾文;张淑坤;唐斯义
山东科技大学地球科学与工程学院,山东 青岛 266590||中国地质调查局成都地质调查中心(西南地质科技创新中心),四川 成都 610218中国地质调查局成都地质调查中心(西南地质科技创新中心),四川 成都 610218山东科技大学地球科学与工程学院,山东 青岛 266590||中国地质调查局成都地质调查中心(西南地质科技创新中心),四川 成都 610218中国电建集团西北勘测设计研究院有限公司,陕西 西安 710061中国地质调查局成都地质调查中心(西南地质科技创新中心),四川 成都 610218山东科技大学地球科学与工程学院,山东 青岛 266590||中国地质调查局成都地质调查中心(西南地质科技创新中心),四川 成都 610218中国地质大学(武汉),湖北 武汉 430074山东科技大学地球科学与工程学院,山东 青岛 266590||中国地质调查局成都地质调查中心(西南地质科技创新中心),四川 成都 610218
天文与地球科学
大渡河水电站深厚覆盖层深基坑边坡稳定性数值计算
Dadu Riverhydropower stationdeep overburden layerstability of excavation slope in deep foundation pitnumerical computation
《沉积与特提斯地质》 2026 (3)
554-566,13
四川省科技计划项目(2024YFFK0112)中国地质调查局项目(DD20251300215)
评论