南俄5水电站系统变电站拆迁后改造方案设计OA
Design of the Renovation Plan for Nam Ngum 5 Hydropower Station System Substation after Demolition
老挝国家电力公司(EDL)拟对位于南俄 5 水电站约 1 km 的南俄 5 系统变电站进行拆迁,影响到南俄5 水电站的送出,为保证电站运行的灵活性和供电可靠性,南俄 5 水电站升压站相关设备需要进行改造.文章对南俄 5 水电站系统变电站拆迁后改造方案的设计思路、升压站相关的电网输电设备、控制保护及通信设备等方面的关键设计进行了总结和分析.
EDL plans to demolish Nam Ngum 5 system substation located approximately 1km away from Nam Ngum 5 hydropower station,which will affect the power transmission of Nam Ngum 5 hydropower station.In order to ensure the flexibility and reliability of the power station operation,the relevant equipment of Nam Ngum 5 hydropower station booster station needs to be renovated.The paper summarizes and analyzes the design ideas for the renovation plan of Nam Ngum 5 hydropower station system substation after demolition,as well as the key designs related to the power grid transmission equipment,control protection,and communication equipment of the booster station.
徐涛
中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
信息技术与安全科学
升压站电气设备计算机监控系统保护系统通信系统
boosting stationelectrical equipmentcomputer monitoring systemprotection systemcommunication system
《云南水力发电》 2026 (9)
89-93,5
中国电建集团科技项目(DJ—ZDXM—2023-43)