济南热电集团新建2×66万kW先进燃煤机组主要承担中心城区冬季供热保障及夏季迎峰供电任务,为满足新建机组的燃煤供给需求,同时考虑企业成本、环保效益、安全稳定等因素,需配套建设铁路专用线1条.结合燃煤机组所在位置、区域内既有铁路及车站现状,研究了该专用线与国铁I级干线崮山站、党家庄站、炒米店站的接轨技术条件;在确定崮山站具备接轨条件的基础上,对比分析了不同建设方案下运输组织、工程投资、社会协调等情况.经济技术比选结果表明:相较于党家庄、炒米店2个车站,专用线于崮山站接轨并设置横列式车场方案,机车牵引条件较好,运输组织更顺畅,工程投资更节省.

The newly built 2×660 000 kW advanced coal-fired units of Jinan Thermal Power Group mainly undertake the tasks of heating supply guarantee in winter and peak power supply in summer for the central city.To meet the coal supply demand of the new units and consider factors such as enterprise cost,environmental protection benefits,safety,and stability,it is necessary to construct a railway industrial siding.Combined with the location of the coal-fired units and the current situation of existing railways and stations in the region,the technical conditions for the track junction of the industrial siding with Gushan Station,Dangjiazhuang Station,and Chaomidian Station on the national railway Class I main line were studied.Based on the determination that Gushan Station meets the track junction conditions,the transportation organization,engineering investment,and social coordination under different construction schemes were comparatively analyzed.The results of economic and technical comparison show that compared with Dangjiazhuang Station and Chaomidian Station,the scheme of track junction of the industrial siding with Gushan Station and setting up a transverse yard has better locomotive traction conditions,smoother transportation organization,and more economical engineering investment.

张有洋;何西健

中铁二院北方勘察设计有限责任公司 线站所,山东 济南 250000中铁二院北方勘察设计有限责任公司 线站所,山东 济南 250000

交通工程

铁路专用线接轨方案铁路站场国铁干线方案比选

Railway Industrial SidingTrack Junction SchemeRailway Station YardNational Railway Main LineScheme Comparison

《铁路物流》 2026 (9)

52-57,6

10.16669/j.cnki.issn.2097-5899.202504020002