首页|期刊导航|科技创新与应用|基坑开挖对邻近高架桥的影响分析

基坑开挖对邻近高架桥的影响分析OA

中文摘要英文摘要

根据城市发展规划的需要,调蓄设施有时会不可避免地位于城市高架桥附近,其施工会对城市高架桥的安全运营造成影响.该文依托某市政调蓄设施开挖工程,对比分析设计可行的前置塘开挖及管道施工方案,给出邻近桥梁结构监测方案;通过数值模拟及现场监测手段研究前置塘开挖、管道基坑开挖及顶管施工等工程活动引起地层及桥梁变形规律;最后,讨论管道基坑、前置水塘开挖与顶管施工对桥梁的影响.

In accordance with urban development planning requirements,flood control facilities are sometimes unavoidably located near elevated expressways,and their construction inevitably impacts the safe operation of these structures.Based on the excavation project of a municipal regulation and storage facility,this paper compares,analyzes and designs feasible pre-pit excavation and pipeline construction plans,and provides a monitoring plan for adjacent bridge structures.Through numerical simulation and on-site monitoring methods,the deformation laws of the formation and bridge caused by engineering activities such as pre-pit excavation,pipeline foundation pit excavation and pipe jacking construction are studied;Finally,the impact of pipeline foundation pit,pre-pit excavation and pipe jacking construction on the bridge is discussed.

蔡智;杨琦;刘正新;卢荟;张鑫磊

中国水利水电第七工程局有限公司,成都 610213中国水利水电第七工程局有限公司,成都 610213中国水利水电第七工程局有限公司,成都 610213南京工业大学 城市地下空间研究中心,南京 211816南京工业大学 城市地下空间研究中心,南京 211816

建筑与水利

基坑开挖顶管施工变形控制数值模拟调蓄设施

foundation pit excavationpipe jacking constructiondeformation controlnumerical simulationregulation and storage facilities

《科技创新与应用》 2026 (27)

80-86,7

国家自然科学基金(52478346)

10.19981/j.CN23-1581/G3.2026.27.018

评论