"114号文"背景下抽水蓄能盈利策略研究OA
Pumped Storage Profitability Strategies in the Context of Document No.114
发改价格"114 号文"的出台,对抽水蓄能的传统收益模式产生深刻影响.本文立足于抽水蓄能价格政策的演变历程与电力市场体系的建设进程,综合运用政策对比分析与电能量-调频-备用联合市场的双层出清博弈推演,系统探究"114 号文"对抽水蓄能项目盈利模式的潜在影响.结果表明:"114 号文"标志着抽水蓄能电价机制从"政府定价"向"市场驱动"的关键转型,抽水蓄能收益结构由传统的单一容量电费补偿,逐步演变为"保底容量收益+市场弹性收益"的双轨模式;在电力市场体系快速构建的过渡期,抽水蓄能的盈利模式短期内将面临较大挑战,但从长远来看,随着市场机制的日益完善,其在灵活调节和辅助服务等方面的多元价值将得到充分释放.基于双层出清博弈模型,针对电力市场体系未来发展的 3 个阶段,分别推演了电网企业和非电网企业控股抽水蓄能电站的盈利策略.
The issuance of the National Development and Reform Commission(NDRC)"Document No.114"has profoundly influenced the traditional revenue mode of pumped-storage hydropower(PSH).This paper systematically investigates the potential impact of Document No.114 on the profitability of PSH projects by reviewing the evolution of pricing policies for pumped storage and the development of electricity market systems.A combined approach of policy comparison analysis and a dual-level clearing game simulation of an energy-regulating-reserve joint market are employed.The results show that:(a)Document No.114 marks a critical transition of the PSH pricing mechanism from"government-determined pricing"to"market-driven mechanisms",and the revenue structure of PSH has gradually evolved from a single capacity charge-based compensation to a dual-track model comprising"guaranteed capacity revenue"and"market-based flexible revenue";and(b)during the transitional period of rapid electricity market development,the profitability of PSH faces significant short-term challenges,however,in the long run,as market mechanisms mature,the diversified value of PSH in providing flexible regulation and ancillary services will be fully realized.Using the dual-level clearing game model,the optimal profit-seeking strategies of PSH stations controlled by grid companies versus non-grid enterprises are derived for three distinct future stages of electricity market system development.
任爱武
水电水利规划设计总院,北京 100120
建筑与水利
抽水蓄能盈利策略"114号文"双层出清博弈模型政策对比
pumped storageprofitability strategyDocument No.114dual-level clearing game modelpolicy comparative analysis
《水力发电》 2026 (10)
1-8,69,9
国家自然科学基金资助项目(52409099,52409163)
评论