厚硬岩层下小煤柱沿空巷道钻孔爆破卸压协同控制研究OA
Study on coordinated control of borehole blasting destressing for gob-side entry with small coal pillars under thick and hard rock strata
针对营盘壕2102工作面厚硬岩层下留设大煤柱采出率低和留设小煤柱巷道围岩变形量大的矛盾,通过采用理论分析、数值模拟与现场实测等方法,对留设煤柱合理宽度与小煤柱钻孔爆破卸压协同支护进行了研究,得到如下结论:①弧形三角块结构的稳定性直接决定了巷道变形程度,小煤柱作为支撑弧形三角块的核心载体,其留设宽度是保证巷道安全的关键;②通过采用理论分析与FLAC3D数值模拟的方法,确定留设小煤柱的合理宽度,最终得出最佳的煤柱宽度为5m;③针对小煤柱护巷围岩位移量大与矿压显现剧烈等特征,提出了"支-卸"协同支护机理,通过采用主动支护与钻孔爆破卸压相结合的方式,实现小煤柱护巷的稳定性;④实践表明,通过留设5m煤柱并采用钻孔爆破卸压和配套合理支护技术,两帮与顶底板的位移量趋于稳定,工作面应力也未超过预警值,大幅度提高了小煤柱沿空掘巷的工作面围岩稳定性,为类似条件矿井安全高效开采提供借鉴和参考.
To address the contradiction between low recovery rate caused by large coal pillars and excessive surrounding rock deformation of roadways with small coal pillars under thick and hard rock strata in No.2102 Face of Yingpanhao Mine,a study on the reasonable width of coal pillars and the coordinated support of small coal pillars combined with borehole blasting for pressure relief was carried out using theoretical analysis,numerical simulation,and on-site monitoring.The main conclusions were as follows:①The stability of the arc-shaped triangular block structure directly determined the degree of roadway deformation.As the core carrier supporting the arc-shaped triangular block,the width of the small coal pillar was the key to ensuring roadway safety.② The reasonable width of the small coal pillar was determined through theoretical analysis and FLAC3D numerical simulation,and the optimal coal pillar width was finally obtained as 5 meters.③Aiming at the characteristics of large surrounding rock displacement and intense mine pressure behavior in roadways protected by small coal pillars,a"support-pressure relief'coordinated support mechanism was proposed.The stability of roadways protected by small coal pillars was realized by combining active support with borehole blasting for pressure relief.④Practice had shown that by setting a 5-meter coal pillar,adopting borehole blasting for pressure relief,and matching reasonable support technologies,the displacement of both sides and the roof and floor tended to be stable,and the working face stress did not exceed the early warning value.This had greatly improved the surrounding rock stability of gob-side entry driving with small coal pillars,providing a reference for the safe and efficient mining of coal mines under similar conditions.
翟梅玉
肥城市应急救援指挥中心,山东泰安 271600
矿业与冶金
沿空掘巷小煤柱钻孔卸压爆破卸压围岩控制
gob-side entry drivingsmall coal pillarborehole pressure reliefblasting pressure reliefsurrounding rock control
《煤炭与化工》 2026 (9)
23-29,7