基于贵州毕节某电动重卡充电站的充电桩选型对比研究OA
A comparative investigation into charging point selection at a station in Bijie,Guizhou
针对商用车 MW 级充电标准演进及电动重卡充电场站建设需求,本文以贵州毕节某电动重卡充电站为研究对象,对比分析一体式与分体式充电桩的技术瓶颈、经济性及工程适用性.研究发现,充电桩单枪功率已由早期 3.3 kW 演进至 MW 级(1 MW+),而风冷散热在 360 kW 功率下的表面热流密度达 0.36 W/cm2,已接近物理极限,液冷技术是实现极速补能的必然趋势.定量对比显示,在 8 车位(16 枪)建设规模下,分体式方案虽设备采购成本略高,但通过优化低压布局,其电缆投入较一体式方案节约 13.09 万元,降幅达 37.6%,带动总前期投入降低约 1.45%.综合可靠性与灵活性分析,选型原则建议:场地狭小、单车电池容量≤425 kW·h 且追求建设效率的场景优先选用一体式充电桩;高流量、有未来功率平滑升级需求的场站应优先选择分体式充电桩,以实现更优的全生命周期投资效益与投资保护.
In response to the evolution of megawatt-class charging standards for commercial vehicles and the requirements for the construction of electric heavy-duty truck charging stations,this paper takes an electric heavy-duty truck charging station in Bijie,Guizhou,as its subject of study,and conducts a comparative analysis of the technical bottlenecks,economic viability and engineering applicability of integrated and split-type charging piles.The study finds that the power output per charging point has evolved from the early 3.3 kW to the megawatt level(1 MW+),whilst the surface heat flux density of air-cooling at 360 kW reaches 0.36 W/cm2,approaching the physical limit;liquid cooling technology is therefore an inevitable trend for achieving ultra-fast charging.Quantitative comparisons show that for a 8 parking spaces(16-guns)installation,although the equipment procurement cost of the split-type solution is slightly higher,optimizing the low-voltage layout results in cable costs that are 130 900 yuan lower than the integrated solution,a reduction of 37.6%,leading to an overall reduction in initial investment of approximately 1.45%.Based on a comprehensive analysis of reliability and flexibility,the following selection principles are recommended:for sites with limited space,where individual vehicle battery capacity is≤425 kW·h and construction efficiency is a priority,integrated charging piles should be the preferred choice;whereas for high-traffic stations with future requirements for power upgrades,the split-type charging stack should be selected to achieve better overall life cycle investment benefits and investment protection.
何康为;袁贵涛
中国石化销售股份有限公司贵州石油分公司,贵阳 550002中国石化销售股份有限公司贵州石油分公司,贵阳 550002
单枪功率MW级充电液冷散热一体式充电桩分体式充电桩成本对比
single-gun powermegawatt-class chargingliquid coolingintegrated charging stationsplit-type charging stationcost comparison
《电气技术》 2026 (9)
73-77,84,6