城市化推进与极端降雨增多使城市排水系统面临内涝与溢流污染等突出问题,尤其在雨污混接严重的区域,易在强降雨下出现污水井冒溢风险.为解决这一问题,以国内某存在雨污混接及冒溢风险的片区为案例开展研究.通过排查混接现状、布设液位监测点、安装自研管道智能调控闸门,结合SWMM模型对片区水动力特征进行模拟复现.模型在关键点位纳什效率系数≥0.75,能够准确表征晴雨天液位变化,为调度策略提供可靠基础.在典型设计暴雨与实际降雨条件下,系统评估了不同闸门组合对污水井冒溢的控制效果.结果表明,关闭闸门数量越多,冒溢点WS7峰值液位下降越显著.在2025年5月22-23日累计55.8 mm降雨事件中,关闭6个闸门可将WS7峰值液位控制在2.55 m,有效避免约1 h冒溢,并保持系统运行裕度.进一步模拟显示,现有6个闸门可应对约12 h、95.7 mm的同型降雨.通过水质监测与闸门时序调控分析发现,在液位明显上升后及时关闭闸门,可有效截流高污染初期雨水并同时减少低污染径流排入污水系统,实现冒溢控制与水质保护的双重效果.研究验证了以模型支撑、智能设施与智慧平台为核心的排水调度体系的可行性.自2025年5月起,该体系在研究片区常态化运行后成功避免多次强降雨下的冒溢风险,体现出良好的工程应用与推广价值.
The acceleration of urbanization and the increasing frequency of extreme rainfall events have posed prominent problems such as urban flooding and overflow pollution to the urban drainage system.Particularly in areas with severe misconnections between stormwater and wastewater pipelines,where strong rainfall can easily trigger sewage manhole overflow.To address this issue,this study focuses on a China urban area with known storm-sewage misconnections and overflow risks.By investigating the misconnection conditions,installing water-level monitoring devices,and deploying self-developed intelligent pipeline control gates,combined with an SWMM-based hydraulic simulation model,the study reconstructs the hydrodynamic characteristics of the drainage system.The model achieves a Nash-Sutcliffe efficiency coefficient of≥0.75 at key monitoring points,accurately reproducing water-level variations under both dry and wet weather conditions,thereby providing a reliable foundation for scheduling decisions.Under both typical design storms and actual rainfall events,the study evaluates the overflow-control effectiveness of different gate operation combinations.Results indicate that closing a greater number of gates leads to a more pronounced reduction in the peak water level at the overflow-prone point WS7.During the rainfall event on May 22-23,2025,with a cumulative precipitation of 55.8 mm,closing all six gates controlled the peak water level at WS7 to 2.55 m,effectively preventing approximately one hour of overflow while maintaining operational safety margins.Further simulations show that the system with the existing six gates can withstand a similar 12-hour rainfall event with a total precipitation of 95.7 mm.Water-quality monitoring and time-series gate-operation analysis reveal that timely gate closure after a noticeable rise in water level can effectively intercept highly polluted first-flush runoff while reducing the inflow of low-pollution stormwater into the wastewater system,achieving dual benefits in overflow mitigation and water-quality protection.The study verifies the feasibility of a drainage scheduling framework that integrates model-based decision support,intelligent control facilities,and a smart water-management platform.Since its routine deployment in May 2025,the system has successfully prevented overflow events during multiple heavy rainfalls in the study area,demonstrating strong engineering applicability and significant potential for broader implementation.
侯雨坤;胡晓玲;雷洋;许帆;陈亚松;许彦;贾伯阳
长江经济带生态环境国家工程研究中心,湖北 武汉 430014||中国长江三峡集团有限公司,湖北 武汉 430010长江生态环保集团有限公司,湖北 武汉 430010||三峡环境科技有限公司,上海 201722长江生态环保集团有限公司,湖北 武汉 430010||三峡环境科技有限公司,上海 201722长江生态环保集团有限公司,湖北 武汉 430010||三峡环境科技有限公司,上海 201722长江经济带生态环境国家工程研究中心,湖北 武汉 430014||中国长江三峡集团有限公司,湖北 武汉 430010长江生态环保集团有限公司,湖北 武汉 430010||三峡环境科技有限公司,上海 201722长江经济带生态环境国家工程研究中心,湖北 武汉 430014||中国长江三峡集团有限公司,湖北 武汉 430010
建筑与水利
城市排水系统冒溢SWMM模型调度决策智慧水务
urban drainage systemoverflowSWMM modelscheduling decisionsmart water management
《中国农村水利水电》 2026 (9)
50-56,7