首页|期刊导航|中国电力|新型储能系统辅助燃煤机组灵活运行策略研究进展

新型储能系统辅助燃煤机组灵活运行策略研究进展OA

Research progress on flexible operation strategies for coal-fired units assisted by new-type energy storage systems

中文摘要英文摘要

加快能源结构转型,构建新型电力系统是目前中国实现"双碳"目标的重要举措之一.大规模新能源电力并网对传统燃煤机组参与调频、调峰过程提出了更高要求.通过配置新型储能系统可以有效提升燃煤机组的灵活运行能力.为此,从燃煤机组运行灵活性影响因素分析出发,首先介绍了常用于煤电耦合运行的新型储能方式及技术特点;其次,回顾了现有研究中火电储能系统的耦合方式、运行及控制模式、储能容量配置策略,并归纳分析了各类策略的特点及适用场景;然后,结合实际工程案例分析了储能系统辅助燃煤机组的联合运行过程;最后,基于现有研究,探讨未来发展的挑战与前景.

Accelerating energy-structure transformation and building the new power systems are among the important measures for China to achieve the goals of"carbon peaking"and"carbon neutrality".Large-scale new energy access to the power grid imposes higher requirements on traditional coal-fired units to participate in the process of peak regulation and frequency regulation.Equipping coal-fired units with new-type energy-storage systems can effectively improve their flexible operation capability.To this end,based on an analysis of the factors affecting the operational flexibility of coal-fired units,this paper firstly introduces the new-type energy-storage modes commonly adopted for coal-power coupled operation together with their technical characteristics.Secondly,it reviews the coupling modes,operation and control modes,as well as energy storage capacity allocation strategies of existing thermal-power and energy-storage systems,and summarizes and analyzes the characteristics and applicable scenarios of various strategies.Thirdly,the joint-operation process of energy-storage systems assisting coal-fired units is analyzed combined with practical engineering cases.Finally,on the basis of existing researches,the challenges and prospects for future development are discussed.

吕游;刘吉臻;王紫仪;杨婷婷;房方;牛海明;陈彦桥

新能源电力系统全国重点实验室(华北电力大学),北京 102206||华北电力大学 控制与计算机工程学院,北京 102206新能源电力系统全国重点实验室(华北电力大学),北京 102206华北电力大学 控制与计算机工程学院,北京 102206华北电力大学 控制与计算机工程学院,北京 102206新能源电力系统全国重点实验室(华北电力大学),北京 102206||华北电力大学 控制与计算机工程学院,北京 102206国能智深控制技术有限公司,北京 102211国家能源集团新能源技术研究院有限公司,北京 102209

火储联合系统燃煤机组新型储能运行灵活性控制策略容量配置

combined thermal-power and energy storage systemcoal-fired unitsnew-type energy storage systemoperational flexibilitycontrol strategycapacity allocation

《中国电力》 2026 (9)

19-38,20

This work is supported by Coal-Major Project(No.2025ZD1701000). 煤炭重大专项资助项目(2025ZD1701000).

10.11930/j.issn.1004-9649.202607091

评论