富水型地下磷矿山联络道涌水封闭墙构建与控排技术OA

Construction and Water-Blocking Bulkhead and Control-Drainage Technology for Water Inrush in Connecting Roadway of Water-rich Underground Phosphate Mine

中文摘要英文摘要

富水型磷矿山的涌水问题严重威胁矿井安全生产.针对某地下磷矿山2 000 m中段联络道在高水压、破碎性磷矿围岩条件下发生的突发涌水,设计并实施了"封闭墙堵水+导流管控排+多级排水"系统治理方案.其方法核心在于:1)在涌水点前方5 m处构建倒楔平面型C30混凝土封闭墙(厚度1.5 m),封堵核心水流通道;2)墙体内预埋φ159 mm×4mm×6m无缝钢管并外接高压阀门,实现涌水量的精准调控;3)优化并联动矿区现有水仓与多级排水设施.工程实践表明:系统排水能力由460 m3/h提升至522 m3/h,涌水量由>200 m3/h降至100m3/h,墙后水压降至≤0.3 MPa,排水系统效率由88%提升至95%.该方案为类似高水压破碎围岩条件下地下矿山涌水控制提供了工程示范.

Water inrush hazards severely threaten the safe production of water-rich phosphate mines.Aiming at the sudden water inrush occurring in the crossheading of the 2 000 m level of an underground phosphate mine under conditions of high water pressure and fractured phosphate rock surrounding rock,a systematic treatment scheme integrating"water blocking via bulkhead+water drainage & regulation through diversion conduits+multi-stage drainage"was designed and implemented.The core technologies of this scheme are as follows:1)An inverted wedge flat C30 concrete bulkhead with a thickness of 1.5 m was constructed 5 m ahead of the water inrush point to block the main water flow channels;2)Seamless steel pipes with specifications of φ159 mm×4 mm×6 m were pre-embedded inside the wall and connected to high-pressure valves externally to realize precise regulation of water inflow rate;3)The existing underground reservoirs and multi-stage drainage facilities of the mine area were optimized and operated in linkage.Engineering practice results show that the system drainage capacity increased from 460 m3/h to 522 m3/h,the water inflow rate dropped from over 200 m3/h to 100 m3/h,the water pressure behind the sealing wall decreased to ≤0.3 MPa,and the efficiency of the drainage system rose from 88%to 95%.This scheme provides an engineering reference for water inrush control in underground mines with similar high water pressure and fractured surrounding rock conditions.

王金华;高家凡;张佳男;曹得志;董健;朱德勇

云南磷化集团有限公司,云南 昆明 650600||江西理工大学资源与环境工程学院,江西赣州 341000五矿二十三冶建设集团有限公司,湖南长沙 410100云南磷化集团有限公司,云南 昆明 650600云南磷化集团有限公司,云南 昆明 650600云南磷化集团有限公司,云南 昆明 650600云南磷化集团有限公司,云南 昆明 650600

矿业与冶金

地下矿山涌水治理封闭墙导流控压多级排水

underground minewater inrush controlbulkheaddiversion and pressure regulationmulti-stage drainage

《云南冶金》 2026 (4)

24-29,6

国家自然科学基金资助项目(52204160)中国博士后科学基金资助项目(2022MD713814)