首页|期刊导航|铁道工程科学(英文)|Solving the railway timetable rescheduling problem with graph neural networks

Solving the railway timetable rescheduling problem with graph neural networksOA

Solving the railway timetable rescheduling problem with graph neural networks

Ping Huang;Zihuan Peng;Zhongcan Li;Qiyuan Peng

School of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,China||National Engineering Laboratory of Integrated Transportation Big Data Application Technology,Southwest Jiaotong University,Chengdu 611756,China||National United Engineering Laboratory of Integrated and Intelligent Transportation,Southwest JiaotongUniversity,Chengdu 610031,ChinaSchool of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,ChinaSchool of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,China||Department of Automation,Tsinghua University,Beijing 100084,ChinaSchool of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,China||National Engineering Laboratory of Integrated Transportation Big Data Application Technology,Southwest Jiaotong University,Chengdu 611756,China||National United Engineering Laboratory of Integrated and Intelligent Transportation,Southwest JiaotongUniversity,Chengdu 610031,China

Timetable reschedulingTimetable rescheduling actionsGraph neural networksEvaluation graphs

Timetable reschedulingTimetable rescheduling actionsGraph neural networksEvaluation graphs

《铁道工程科学(英文)》 2026 (3)

385-406,22

This work was supported by the National Nature Science Foundation of China(Grant numbers:72301221 and 72401158),the National Key Research and Development Program of China(Grant number:2022YFB4300502),and the China Postdoctoral Science Foundation(Grant number:2023M741956).

10.1007/s40534-025-00383-7

评论