为分析抽水蓄能电站地下厂房开挖后的围岩稳定性,探明主洞室间距对岩柱受力特征及围岩变形的影响规律,基于流固耦合理论,并引入基于形函数插值的子模型映射技术,在保证地应力场与渗流边界真实性的前提下构建局部精细化模型,对比分析了35、40 m 和45 m 间距方案下无支护毛洞的力学响应.结果表明:塑性区主要聚集于主洞室直墙拱顶交接处、底板角点及母线洞变断面部位;当间距由40 m 减至35 m 时,相邻洞室应力扰动区重叠导致岩柱呈现塑性贯通趋势,主变洞底板隆起值增加19.1%;当间距增至45 m 时,母线洞顶拱和底板破坏范围扩张.40 m 间距可有效避免应力扰动重叠,且控制变形在相对合理的范围内.研究成果可为抽水蓄能电站洞室群布置提供借鉴.
To analyze the surrounding rock stability of underground powerhouse after excavation of pumped storage power stations and clarify the influence law of main cavern spacing on the stress characteristics of rock pillars and surrounding rock deformation,a local re-fined model is established based on fluid-solid coupling theory and the submodel mapping technology with shape function interpolation,while ensuring the authenticity of in-situ stress field and seepage boundaries.The mechanical responses of unsupported bare caverns un-der spacing schemes of 35 m、40 m and 45 m are compared and analyzed.The results show that the plastic zones are mainly concentrated at the junctions of straight walls and arch crowns of main caverns,floor corners and variable cross-section positions of busbar tunnels.When the spacing decreases from 40 m to 35 m,the overlap of stress disturbance zones between adjacent caverns leads to a trend of plas-tic penetration in rock pillars,and the floor heave of the main transformer tunnel increases by 19.1%.When the spacing rises to 45 m,the damage scope of the roof and floor of busbar tunnels expands.The spacing of 40 m can effectively avoid the overlap of stress disturb-ance and keep the deformation within a relatively reasonable range.The research findings can provide references for the layout of cavern groups in pumped storage power stations.
董嘉辉;侯晓萍
西北农林科技大学 旱区农业水土工程教育部重点实验室,陕西 杨凌 712100西北农林科技大学 旱区农业水土工程教育部重点实验室,陕西 杨凌 712100
建筑与水利
流固耦合地下厂房洞室群围岩稳定性子模型法
fluid-solid couplingunderground workshop cavern groupsurrounding rock stabilitysubmodel method