基于TOC-6S模型的建筑施工进度优化研究OACHSSCD

Research on Construction Schedule Optimization Based on the TOC-6S Model

中文摘要英文摘要

科学的施工进度管控对项目建设全生命周期至关重要,不仅能减少窝工、赶工、停工待料等隐性成本,也有助于塑造企业口碑,增强市场竞争力.因此,针对施工中出现的进度滞后问题,本研究以广东H旧改项目为案例,通过系统分析施工过程中的动态管控记录及历史资料,识别影响进度的关键因素.基于此,引入TOC-6S模型,对施工流程进行瓶颈识别与优化重构,有效提升了施工效率,实现项目进度的动态平衡与目标可控.结果表明,该方法不仅有效解决了具体项目的进度管理难题,而且在成本节约、质量保障与施工安全方面均取得显著效益.本成果为建筑业从经验驱动向瓶颈精准管控的范式转型提供了理论依据与实践路径,有助于提升行业整体资源利用率.

Effective construction schedule management is essential throughout the project lifecycle.It reduces hidden costs such as work stoppages,rushed work,and delays due to material shortages,while also enhancing corporate reputation and market competitiveness.To address schedule delays,this study used the Guangdong H redevelopment project as a case study.This paper analyzed dynamic control records and historical data to identify key factors affecting progress.The TOC-6S model was in-troduced to identify bottlenecks and optimize construction workflows,which improved efficiency and enabled dynamic,controllable schedule management.The results show that this approach not only re-solves schedule management challenges but also deliveres significant benefits in cost savings,quality assurance,and safety.The study provides a theoretical basis and practical pathway for shifting the construction industry from experience-driven practices to precision bottleneck management,thereby improving overall resource utilization.

蒙展瑞

贵州大学 机械工程学院,贵州 贵阳 550025

建筑与水利

建筑施工约束理论进度优化TOC-6S模型

building constructiontheory of constraintsschedule optimizationTOC-6S model

《土木工程与管理学报》 2026 (4)

63-70,8

10.13579/j.cnki.2095-0985.2026.20250430