脱硫脱碳单元吸收塔泛塔原因分析及操作优化OA

Cause analysis and operation optimization for flooding in the absorption tower of the desulfurization and decarbonization unit

中文摘要英文摘要

为解决西北地区某含硫天然气处理脱硫脱碳单元吸收塔频繁泛塔的问题,通过对胺液循环量、原料气温度与进气量、贫液入塔温度、原料气组分等因素开展多组现场控制实验,精准诊断出诱发泛塔的核心因素是原料气温度与进气量协同升高,而非胺液发泡或设备设计缺陷.再经多方案技术经济性对比,创新性地提出了在吸收塔底部加装不锈钢鲍尔环填料的物理破泡方案.实施后,吸收塔平均压降降低3.06 kPa,消泡剂加注周期从3.8 d/次显著延长至8.8 d/次,系统抗干扰能力提升47.6%.研究结果表明操作参数波动对泛塔有关键影响,方案成功解决了泛塔瓶颈,具有运行成本低、效益显著的特点.研究结果为含硫天然气脱硫脱碳单元的工艺优化与设备改造提供了理论依据与技术方案.

To address the frequent flooding issue in the absorption tower of a desulfurization and decarbonization unit of a natural gas processing plant in Northwest China,this study accurately identified through multiple on-site control experiments that the core factor inducing flooding is the synergistic increase in feed gas temperature and flow rate,rather than amine solution foaming or equipment design defects.Through experiments including adjusting amine circulation rate,coordinated/independent control of feed gas temperature and flow rate,control of lean amine inlet temperature,and monitoring of feed gas composition changes,and after multi-scheme technical and economic comparison,an innovative physical defoaming scheme was proposed by installing stainless steel Pall ring packing at the bottom of the absorption tower.After implementation,the average pressure drop of the absorption tower decreased by 3.06 kPa,the defoamer injection period significantly extended from once every 3.8 days to once every 8.8 days,and the system's anti-interference capability improved by 47.6%.This study result shows that the critical impact of operating parameter fluctuations on flooding.The scheme successfully resolves the flooding bottleneck with low operating cost and significant benefits.The research results provide theoretical basis and technical solutions for process optimization and equipment retrofitting of sour gas desulfurization and decarbonization units.

张童景;黄禧;王全宇;张凌轩;何钰

中国石油塔里木油田公司塔西南勘探开发公司,新疆 喀什 844000中国石油塔里木油田公司塔西南勘探开发公司,新疆 喀什 844000中国石油塔里木油田公司塔西南勘探开发公司,新疆 喀什 844000中国石油工程建设有限公司西南分公司,四川 成都 610041中国石油塔里木油田公司塔西南勘探开发公司,新疆 喀什 844000

脱硫脱碳泛塔机理吸收塔泛塔优化物理破泡

Desulfurization and decarbonizationFlooding mechanismAbsorption tower flooding optimizationPhysical defoaming

《天然气与石油》 2026 (4)

28-34,7

10.3969/j.issn.1006-5539.2026.04.004