冷能发电是液化天然气(Liquefied Natural Gas,LNG)接收站冷能利用高效可行的方式之一,上海洋山 LNG 接收站建成中国首套、世界规模最大的 LNG 冷能发电装置.针对环境参数、进料条件和用气需求等工况变化发电量不稳定的问题,对上海洋山 LNG 接收站冷能发电装置系统进行优化研究.基于现场运行经验及相关数据,建立并验证了LNG 冷能发电工艺模型,完成了工艺参数敏感性分析、不同工况下最优参数确定,以得到各工况最大净发电量.研究结果表明:相同条件下夏季单位质量LNG 净发电量比冬季单位质量LNG 净发电量高43.1%,但由于夏季用气量较冬季高峰期用气量低30%~50%,冬季净发电量与夏季净发电量基本持平;海水涨潮时比退潮时净发电量高7.1%;只改变 LNG 组分的工况条件下,LNG 贫液较富液净发电量高17.2%.通过调整海水流量、丙烷循环量、丙烷高压、丙烷低压,优化了夏季贫液、夏季富液、冬季贫液、冬季富液4 种工况,相对于设计参数,最终工艺的净发电量平均提高13.94%,可为类似工艺生产运行优化提供借鉴.

Cold energy power generation is an efficient and feasible method for utilizing the cold energy of liquefied natural gas(LNG)at receiving terminals.Shanghai Yangshan LNG terminal has commissioned China's first and the world's largest LNG cold energy power generation facility.To address the issue of unstable power output caused by variations in environmental conditions,feedstock parameters,and gas consumption demand,an optimization study was conducted on the cold energy power generation system at the terminal.Based on field operational data and experience,a process model of LNG cold energy power generation was established and validated.Sensitivity analyses of process parameters were conducted,and optimal parameters under different operating conditions were determined to maximize the net power output.Results indicate that,under identical conditions,the net power output per unit mass of LNG in summer is 43.1%higher than that in winter;however,due to summer gas demand being 30%~50%lower than peak winter demand,the total net power output in winter is approximately equal to that in summer.Additionally,net power output during high tide is 7.1%higher than that during low tide.Under specified operating conditions where only the LNG composition is varied,the net power output using lean LNG is 17.2%higher than that using rich LNG.By adjusting seawater flow rate,propane flow rate,propane high and low pressures,the system was optimized for four operating conditions—summer lean LNG,summer rich LNG,winter lean LNG,and winter rich LNG.Compared with design parameters,the optimized process increased average net power output by 13.94%,providing practical reference for process operation optimization of similar applications.

袁杨;阳智钢;易宜阳;朱建鲁;徐常安

上海液化天然气有限责任公司,上海 201204中国石油大学(华东)储运与建筑工程学院,山东 青岛 266580中国石油大学(华东)储运与建筑工程学院,山东 青岛 266580中国石油大学(华东)储运与建筑工程学院,山东 青岛 266580广东省招商局海洋装备研究院有限公司,广东 深圳 518060

LNG冷能发电工艺模拟敏感性分析操作优化遗传算法

LNG cold energy power generationProcess simulationSensitivity analysisOperation optimizationGenetic algorithm

《天然气与石油》 2026 (4)

1-9,9

国家自然基金联合重点项目"新型FLNG装置天然气带压液化复杂流动与换热的基础问题"(U21B2085)

10.3969/j.issn.1006-5539.2026.04.001