长三角地区城际、市域(郊)铁路规划实施评估OA
Implementation Evaluation of Intercity and Urban(Suburban)Railway Planning in Yangtze River Delta Region
[目的]城际铁路和市域(郊)铁路是新型城镇化的重要载体,客观评估规划实施情况对于更好推进规划编制及调整、推进项目高质量建设及运营具有重要意义.[方法]以长三角地区为例,从规划实施、项目实施两个维度开展评估.全面梳理国家发改委批复的城际铁路建设规划、市域铁路建设规划、多层次轨道交通规划等实施情况.结合设计文件,对项目的功能定位、线站方案、技术标准、敷设方式、工程投资、建设运营管理、客流效益等进行分析.[结果]研究结果表明,规划实施维度,规划总体推进较为顺利,存在规划类型较多、个别规划实施进度滞后等问题,应规范规划编制,加强中期评估和监督检查,及时总结问题并进行优化调整.项目实施维度、线路功能定位总体合理,但早期也存在"以城际铁路建高铁、以城际铁路建地铁"的情况;线路长度、平均站间距总体合理,部分线路长度偏长,平均站间距<3 km;技术标准相对规范,但制式多样影响线路间互联互通及资源共享;平均地下线比例为 34.4%,平均技术经济指标为 4.6 亿元/km,投资总体可控,但部分线路技术经济指标较高;探索形成以都市圈中心城市为主体的建设运营模式,但仍需加强跨省份、跨都市圈的协调,客流效益总体较差.[结论]以问题为导向,提出项目建设的相关建议.
[Objective]Intercity and urban(suburban)railways are important carriers of new urbanization,and objective evaluation of planning implementation is of great significance for advancing planning formulation and adjustment,as well as high-quality project construction and operation.[Methods]Taking the Yangtze River Delta region as an example,the evaluation was conducted from two dimensions:planning implementation and project implementation.The implementation of intercity railway construction plans,urban railway construction plans,and multilevel rail transit plans approved by the National Development and Reform Commission was comprehensively reviewed.In combination with the design documents,the functional positioning,line and station schemes,technical standards,laying methods,project investment,construction and operation management,and passenger flow benefits of these railway projects were analyzed.[Results]The results showed that in terms of planning implementation,the overall progress was relatively smooth,but problems existed,including the large number of planning types and delays in the implementation of some plans.Planning formulation should be standardized,and mid-term evaluation and supervision should be strengthened to summarize problems promptly and optimize and adjust the plans.In terms of project implementation,the functional positioning of the railway lines was generally reasonable,but there were also cases of"constructing high-speed railways and subways based on intercity railways"in the early stage.Railway lengths and average station spacings were generally reasonable,although some lines were relatively long and the average station spacing was less than 3 km.Technical standards were relatively standardized,but diverse technical systems affected the interconnection and resource sharing among lines.The average proportion of underground lines was 34.4%,and the average technical and economic indicator was 460 million yuan/km.Overall investment was generally controllable,although some lines had relatively high technical and economic indicators.A construction and operation mode centered on central cities in metropolitan areas was explored and developed,but coordination across provinces and metropolitan areas still needed to be strengthened,and passenger flow benefits were generally poor.[Conclusion]This study proposes relevant recommendations for project construction based on a problem-oriented approach.
陈旭;江世雄
中铁第四勘察设计院集团有限公司,武汉 430063深圳技术大学城市交通与物流学院,深圳 518118
交通工程
城际铁路市域铁路铁路规划实施评估归纳总结功能定位技术标准运营管理
intercity railwayurban railwayrailway planningimplementation evaluationsummaryfunctional positioningtechnical standardsoperation management
《铁道标准设计》 2026 (9)