首页|期刊导航|市政技术|无主筋先张预应力高韧性混凝土预制桥墩抗震性能数值仿真分析

无主筋先张预应力高韧性混凝土预制桥墩抗震性能数值仿真分析OA

Numerical Simulation Analysis on Seismic Performance of Precast Piers with Pretensioned High-toughness Concrete without Main Reinforcement

中文摘要英文摘要

传统现浇桥墩为满足抗震设计要求,往往需依赖较高配筋率,易造成现场施工作业复杂、效率偏低.为推动低配筋预应力预制拼装桥墩技术的发展,基于试验验证的数值分析模型,系统探究了耗能钢筋配筋率、预应力筋配筋率、初始张拉应力、承插深度、钢筋-混凝土黏结性能等关键参数对无主筋先张预应力高韧性混凝土预制桥墩抗震性能的影响规律.结果表明:增大耗能钢筋配筋率可有效提高桥墩的承载能力与耗能能力,但会增大残余位移值;提高预应力筋配筋率可显著增强桥墩的初始刚度与峰值承载力,但也会间接增大总轴压比,进而导致残余位移值增大;提高预应力筋初始张拉应力可减小桥墩残余位移值,但会降低桥墩延性性能;增加承插深度虽能提高桥墩的承载力,但会减小剪跨比,可能导致破坏模式由弯曲破坏向弯剪破坏转变.相比之下,采用无黏结预应力筋与无黏结耗能钢筋的组合构造,并适度降低初始张拉应力,可在保证桥墩承载力的同时有效延缓预应力筋屈服、控制预应力损失、减小残余位移值,显著改善桥墩的延性与自复位能力,实现综合抗震性能最优.该研究成果可为低配筋先张预应力高韧性混凝土预制桥墩的抗震优化设计提供理论依据与技术路径.

To satisfy seismic design requirements,conventional cast-in-place piers generally require high reinforce-ment ratios,which brings complicated on-site construction and low efficiency.To promote the development of pre-cast segmental pier technology with low-reinforcement prestressing,this study adopts numerically analyzed models verified by tests to systematically investigate the influences of key parameters on the seismic performance of preten-sioned high-toughness concrete precast piers without main reinforcement,including reinforcement ratio of energy-dissipating steel bars,prestressing tendon ratio,initial jacking stress,socketed embedment depth,and steel-con-crete bond behavior.The results show that increasing the reinforcement ratio of energy-dissipating steel bars effec-tively improves the bearing capacity and energy-dissipation capacity yet enlarges residual displacement.Raising the prestressing tendon ratio significantly enhances initial stiffness and peak bearing capacity,while increasing total ax-ial compression ratio and residual displacement consequently.Higher initial jacking stress of prestressing tendons reduces residual displacement but degrades pier ductility.Increasing socketed embedment depth improves bearing capacity but reduces shear-span ratio,possibly shifting failure mode from flexural failure to flexure-shear failure.Comparatively,the composite configuration of unbonded prestressing tendons and unbonded energy-dissipating steel bars with moderately reduced initial jacking stress can delay yielding of prestressing tendons,control prestress loss and mitigate residual displacement while maintaining bearing capacity.It substantially improves ductility and self-centering capacity and achieves optimal comprehensive seismic performance.The research findings provide theoreti-cal basis and technical approaches for seismic optimization design of low-reinforcement pretensioned high-toughness concrete precast piers.

贾俊峰;张先可;黄河;康玲;柏颢原

北京工业大学桥梁工程安全与韧性全国重点实验室,北京 100124北京工业大学桥梁工程安全与韧性全国重点实验室,北京 100124四川成绵苍巴高速公路有限责任公司成都分公司,四川 成都 618206四川省公路规划勘察设计研究院有限公司,四川 成都 610041四川省公路规划勘察设计研究院有限公司,四川 成都 610041

交通工程

桥梁抗震性能预应力桥墩预制拼装桥墩高韧性混凝土OpenSees数值模拟参数分析

bridge seismic performanceprestressed pierprecast assembled pierhigh-toughness concreteOpenSees numerical simulationparametric analysis

《市政技术》 2026 (9)

1-12,137,13

国家重点研发计划项目(2023YFC3805100,2023YFC3805101)四川省交通运输科技项目(2022-ZL-05)

10.19922/j.1009-7767.2026.09.001

评论