首页|期刊导航|热力发电|基于相似日聚类-TCN-Informer组合模型的短期电力负荷预测研究

基于相似日聚类-TCN-Informer组合模型的短期电力负荷预测研究OA

Short-term power load forecasting via a similar-day clustering-TCN-Informer hybrid model

中文摘要英文摘要

[目的]针对现有短期电力负荷预测模型难以同时学习用电模式差异与长程依赖、致使高波动场景预测精度受限的问题,本文提出一种"相似日聚类-TCN-Informer"组合模型.[方法]首先,利用模糊 C 均值算法依据历史负荷与日历特征将样本划分为工作日、周末和节假日3类相似日,以削弱跨模式噪声;其次,对每一簇数据先由时序卷积神经网络(temporal convolutional network,TCN)提取局部特征,再引入概率稀疏注意力 Informer 捕获长程依赖并生成簇级预测;随后融合气象与电价等外生变量,并采用贝叶斯优化进行全局超参数搜索.[结果]基于澳大利亚能源市场AEMO-NSW 30 min 分辨率数据的 24 h预测实验表明,该模型的均方根误差、平均绝对误差分别较 LSTM降低16.59%和14.66%,较TimesNet降低12.33%和 11.61%,平均绝对百分比误差仅为3.02%.[结论]结果验证了所提方法在精度与鲁棒性上的显著优势,可为电网调度与现货交易提供可靠决策支持.

[Objective]Existing short-term power load forecasting models struggle to simultaneously learn the inherent differences in electricity consumption patterns across diverse scenarios and effectively capture long-range temporal dependencies,so their forecasting accuracy is significantly restricted in high-volatility situations such as extreme weather events,peak load periods,or sudden changes in user behavior.To address this limitation,this paper proposes a novel hybrid forecasting framework named"similar-day clustering-temporal convolutional network(TCN)-Informer".[Methods]First,the fuzzy C-means(FCM)clustering algorithm is employed to categorize historical load samples into three distinct similar-day clusters(working days,weekends,and holidays)based on historical load data and calendar features(e.g.,weekday/weekend flags,holiday labels).This preprocessing step effectively mitigates cross-pattern noise interference caused by heterogeneous consumption behaviors,laying a solid foundation for subsequent feature extraction.Second,for each clustered dataset,a causal dilated TCN is utilized to extract local temporal features and capture short-to medium-term load fluctuations,as its dilated convolution structure enables efficient expansion of the receptive field without increasing computational complexity while avoiding future information leakage.Subsequently,the Informer model equipped with a probabilistic sparse attention mechanism is introduced to capture long-range dependencies in load time series,which significantly reduces the computational burden compared to traditional attention mechanisms and enhances the model's ability to learn long-term temporal correlations.Moreover,exogenous variables closely related to power load,including meteorological factors(temperature,humidity,solar irradiation)and real-time electricity prices,are integrated into the forecasting framework to improve the comprehensiveness of input information.To optimize the model's hyperparameters,Bayesian optimization is adopted to efficiently search the global hyperparameter space,outperforming traditional grid search in both search efficiency and optimization performance.[Results]Experimental validations for 24-hour load forecasting are conducted using 30-minute resolution data from the AEMO-NSW power market,covering a one-year period with over 17 000 samples.The results demonstrate that the proposed model achieves remarkable performance:its root mean square error(RMSE)and mean absolute error(MAE)reduce by 16.59%and 14.65%compared with those of the classic LSTM model,and by 12.33%and 11.60%in contrast to the advanced TimesNet model,with the mean absolute percentage error(MAPE)as low as 3.02%.Particularly in high-volatility scenarios,the model maintains superior stability and accuracy.[Conclusion]These findings fully verify the prominent advantages of the proposed method in forecasting precision and robustness,which can provide reliable decision-making support for power grid dispatching,electricity spot trading,and energy resource optimization in practical power systems.

吴涛;罗睿;陈武;洪漭;刘端阳;曹强;王亚;胡胤;王昊;余威;杨永军

西安热工研究院有限公司,陕西 西安 710054西安热工研究院有限公司,陕西 西安 710054华能江西能源销售有限责任公司,江西 南昌 330000华能湖北能源销售有限责任公司,湖北 武汉 430077华北电力大学能源动力与机械工程学院,北京 102206华能湖北能源销售有限责任公司,湖北 武汉 430077华能湖北能源销售有限责任公司,湖北 武汉 430077华能湖北能源销售有限责任公司,湖北 武汉 430077华能湖北能源销售有限责任公司,湖北 武汉 430077华能湖北能源销售有限责任公司,湖北 武汉 430077西安热工研究院有限公司,陕西 西安 710054

短期电力负荷预测相似日聚类时序卷积神经网络Informer长程依赖

short-term power load forecastingsimilar-day clusteringtemporal convolutional networkInformerlong-range dependency

《热力发电》 2026 (8)

45-54,10

中国华能集团有限公司总部科技项目(HNKJ25-H15) Science and Technology Project of China Huaneng Group Co.,Ltd.(HNKJ25-H15)

10.19666/j.rlfd.202602018

评论