核电厂主回路系统阀门泄漏原因OA
Reasons for valve leakage in the main circuit system of nuclear power plants
某核电机组主回路系统阀门发生泄漏事故.采用宏观观察、射线检测、化学成分分析、力学性能测试、金相检验、扫描电镜及能谱分析等方法分析了阀门泄漏的原因.结果表明:阀体合模区域存在微裂纹与微孔洞;裂纹内部Cr和Mn元素含量异常偏高,裂纹两侧的母材和焊缝界面处存在台阶,该裂纹形貌与焊接热裂纹特征不符,判定为阀体铸造制造阶段形成的原始裂纹缺陷;在后续焊接残余应力与服役载荷应力的协同作用下,裂纹持续扩展,最终阀门发生泄漏.
A leakage accident occurred in the main circuit system valve of a nuclear power unit.The causes of the valve leakage were analyzed using macroscopic observation,radiographic testing,chemical composition analysis,mechanical property testing,metallographic examination,scanning electron microscopy and energy spectrum analysis.The results show that microcracks and microvoids were present in the mold closing area of the valve body.The Cr and Mn contents inside the cracks were abnormally high,and steps existed at the interface between the base material and weld seam on both sides of the cracks.The crack morphology did not match the characteristics of welding hot cracks,indicated it was an original crack defect formed during the casting manufacturing stage of the valve body.Under the combined action of subsequent welding residual stress and service load stress,the cracks continued to propagate,ultimately leading to valve leakage.
谷昊;辛虹阳;李燕
辽宁红沿河核电有限公司,大连 116000中国核动力研究设计院第一研究所,成都 610000苏州热工研究院有限公司,苏州 215004
通用工业技术
阀门密封焊缝裂纹高温拉伸性能显微组织
valvesealing weldcrackhigh-temperature tensile propertymicrostructure
《理化检验-物理分册》 2026 (8)
35-40,6