充填体约束下遗留底柱协同回采方案优化研究OA
Optimization of Collaborative Recovery Schemes for Remaining Pillars Under Backfill Constraints
高效安全回收遗留矿产资源对矿山的可持续发展具有重要意义.某金硫矿采用分段空场嗣后充填法进行开采,各中段之间最终留设 6 m底柱,为实现该矿山底柱的安全高效回收,以矿山-620~-820 m中段遗留底柱为研究对象,设计了 4种采场结构参数和 3种隔离间柱留设方案,分析底柱回采极限跨度、隔离间柱宽度与底柱回采高度之间的关系,进而提出底柱资源回收的优化建议;在此基础上,为提高底柱回采效率,研究了相邻中段底柱协同回采的稳定性.结果表明:当底柱回采高度为 3、4及 5 m时,回采极限跨度分别为 9、9及 6 m,相应的隔离间柱宽度应不小于 2、3及 3 m,各方案底柱矿石回收率分别约为 41.18%、50.98%、56.37%;最优方案为底柱回采高度 5 m、回采极限跨度 6 m、隔离间柱宽度 3 m,矿石回收率较原计划开采方案提高了 15.19百分点.相邻中段底柱协同回采,当上中段回采进度超前下中段时,其回采位置的水平距离应不小于18 m.研究结论对类似矿山具有指导意义.
Efficient and safe recovery of legacy mineral resources is of great significance for the sustainable development of mines.The gold-sulfur mine adopts the sublevel open stope subsequent filling,and a 6-meter bottom pillar was finally left between each middle section.In order to achieve the safe and efficient recovery of the bottom pillar of this mine,taking the remaining bottom pillar in the middle section from-620 m to-820 m of the mine as the research object,four stope structure parameters and three isolation column retention schemes were designed.Based on the relationship between the limit span of bottom pillar mining,the width of the isolation pillar and the height of bottom pillar mining,the optimization suggestions for the resource recovery of the bottom pillar were then put forward.On this basis,the stability of the coordinated mining of adjacent middle bottom pillars was studied,in order to improve the mining efficiency of the bottom pillars.The results show that when the mining height of the bottom pillar is 3 m,the limit span of pillar recovery is 9 m,and the corresponding width of the isolation pillar should not be less than 2 m.For a mining height of 4 m,the limit span remains 9 m,but the required isolation pillar width increases to 3 m.When the mining height reaches 5 m,the limit span decreases to 6 m,with the isolation pillar width similarly requiring a minimum of 3 m.These parameters ensure structural stability during sequential extraction while maintaining safe stress distribution thresholds.The optimized plan entails a sill pillar mining height of 5 m,an extraction span limit of 6 m,and an isolation barrier pillar width of 3 m.When the mining progress of the upper middle section is ahead of that of the lower middle section,the horizontal distance between its mining positions should be no less than 18 meters.The research conclusion is of guiding significance for similar mines.
曾鹏;匡超;熊良锋;赵一凡;崔前付;赵奎;朱雨贤;刘宇
江西理工大学 资源与环境工程学院,江西 赣州 341000||稀有金属资源安全高效开采江西省重点实验室,江西 赣州 341000江西理工大学 资源与环境工程学院,江西 赣州 341000江西理工大学 资源与环境工程学院,江西 赣州 341000江西理工大学 资源与环境工程学院,江西 赣州 341000安徽焦冲矿业有限公司,安徽 铜陵 244061江西理工大学 资源与环境工程学院,江西 赣州 341000||稀有金属资源安全高效开采江西省重点实验室,江西 赣州 341000江西理工大学 资源与环境工程学院,江西 赣州 341000江西理工大学 资源与环境工程学院,江西 赣州 341000
矿业与冶金
底柱协同回采数值模拟监测稳定性分析
bottom pillarsynergistic miningnumerical simulationmonitoringstability analysis
《矿产保护与利用》 2026 (4)
37-48,12
江西省重点研发计划重点项目(20212BBG71009)广西重点研发计划项目(2022AB31022)
评论