首页|期刊导航|矿产保护与利用|深部过断层巷道围岩稳定性及控制技术研究

深部过断层巷道围岩稳定性及控制技术研究OA

Stability and Control Technology of Surrounding Rock of Deep Tunnel Through Frecture

中文摘要英文摘要

顾北煤矿 14321工作面埋深大、地应力高,断层发育,巷道围岩难以控制.针对 14321风巷穿越断层破碎带的支护问题,通过顶板弯曲变形力学分析,计算得到顶板最大挠度和破裂区宽度,与数值模拟结果相互印证;采用 FLAC3D 数值模拟方法,模拟了煤巷过断层全过程的围岩响应.重点分析了 F14321-1断层前后 10 m范围内围岩的超前支承应力、塑性区及位移场的动态演化规律.结果表明:(1)工作面超前支承应力峰值呈先增后降趋势;(2)距断层 10~5 m区段,巷道两帮塑性区范围大于顶底板;(3)掘进至距断层 5 m处,顶底板塑性破坏程度显著加剧;(4)过断层期间两帮移近量始终高于顶底板,且断层处围岩移近量出现突变,顶板位移增幅最为突出.实施锚-网-索支护后,巷道顶板下沉量减少 34 mm,两帮移近量减少21 mm,底部鼓起量减少44 mm,证实该支护体系可有效抑制围岩变形,保障过断层巷道的稳定性控制.

The 14321 working face of Gubei Coal Mine has a large burial depth,high ground stress,well-developed fractures,and the surrounding rock of the roadway is difficult to control.To address the support challenges of the 14321 ventilation roadway passing through a fracture fracture zone,this study conducted a mechanical analysis of roof bending deformation.The maximum roof deflection and fracture zone width were calculated,with results corroborated by numerical simulations.Using the FLAC3D numerical simulation method,the entire process of the roadway traversing the fracture and the surrounding rock response was simulated.The analysis focused on the dynamic evolution of the advanced abutment stress,plastic zone,and displacement field within 10 meters ahead of and behind the F14321-1 fracture.The results indicate that:(1)The peak value of the working face's advanced abutment stress initially increases and then decreases;(2)In the section 10 to 5 meters from the fracture,the plastic zone range in the roadway ribs is larger than that in the roof and floor;(3)When excavation reaches 5 meters from the fracture,the degree of plastic failure in the roof and floor significantly intensifies;(4)During fracture crossing,the convergence of the ribs consistently exceeds that of the roof and floor,with a sudden change in surrounding rock convergence occurring at the fracture,where the increase in roof displacement is most pronounced.Following the implementation of combined bolt-mesh-cable support,roadway roof subsidence decreased by 34 mm,rib convergence reduced by 21 mm,and floor heave decreased by 44 mm.This confirms the effectiveness of this support system in controlling surrounding rock deformation and ensuring the stability control of the roadway traversing the fracture.

李世辉;李冰冰;华心祝;李怀宾;刘强

淮南矿业(集团)有限责任公司 深部煤炭安全开采与环境保护全国重点实验室,安徽 淮南 232001淮南矿业(集团)有限责任公司 深部煤炭安全开采与环境保护全国重点实验室,安徽 淮南 232001安徽理工大学 安全科学与工程学院,安徽 淮南 232001安徽理工大学 安全科学与工程学院,安徽 淮南 232001安徽理工大学 安全科学与工程学院,安徽 淮南 232001

矿业与冶金

深部煤巷高地应力过断层应力演化数值模拟锚-网-索支护

deep coal roadwayhigh ground stresspassing through the fracturestress evolutionnumerical simulationbolt-mesh-cable support

《矿产保护与利用》 2026 (4)

10-19,10

国家自然科学基金项目(52374075)

10.13779/j.cnki.issn1001-0076.2025.11.002

评论