约束理论在工程造价管理中的应用研究OA

Application of Constraint Theory in Engineering Cost Management

中文摘要英文摘要

工程造价管理是工程项目管理的核心,直接关系工程投资效益.然而,当前中国工程建设普遍存在管控压力大、资源浪费等问题.约束理论强调识别系统的关键瓶颈以实现整体最优,为破解这一困境提供了新思路.本文运用约束理论,对造价管理中的概算、预算、结算三个阶段进行系统分析,明确各阶段的关键约束,提出全流程改进方案,并构建持续改进机制.研究表明,约束理论为工程造价管理提供了系统的分析框架与可行策略,对提升项目投资效益具有借鉴意义.

Engineering cost management lies at the core of project management and directly affects investment efficiency.However,construction projects in China commonly face challenges such as high management pressure and resource waste.The theory of constraints,which emphasizes identifying systemic bottlenecks to achieve overall optimization,offers a novel approach to addressing this dilemma.This study systematically applies the theory of constraints to the three principal stages of engineering cost management-cost estimation,budgeting,and final settlement-thereby identifying stage-specific constraints,formulating an integrated improvement strategy,and establishing a mechanism for sustained performance enhancement.The findings indicate that the theory of constraints provides a rigorous analytical framework and actionable strategies for engineering cost management,contributing meaningful insights to enhance project investment efficiency.

林卓瀚;陈可

广东省粤东技师学院,广东汕头 515000巴州若羌河米兰河流域管理处,新疆巴州 841000

建筑与水利

约束理论工程造价概算管理预算控制结算优化

theory of constraintsengineering costcost estimation managementbudget controlsettle-ment optimization

《建筑设计管理》 2026 (6)

27-32,6

10.3969/j.issn.1673-1093.2026.06.004

评论