围填海工程通过改变岸线形态重塑近岸水动力与泥沙输运格局.本研究以杭州湾鱼山岛围填海工程为对象,基于 MIKE21构建二维水动力-泥沙耦合模型,在验证模型可靠性的基础上,系统分析了工程实施前后潮流场、底床切应力、悬浮泥沙浓度(SSC)分布及海床冲淤变化特征.结果表明:人工围堤的阻挡使迎流面和背流面流速整体降低 0.2~0.5 m/s,底床切应力下降 0.2~0.4 N/m2,泥沙再悬浮受到抑制,近岸 SSC降低 0.02~0.06 kg/m3;堤角处受挑流作用影响,流速和底床切应力分别增加 0.1~0.3 m/s和 0.1~0.3 N/m2,SSC升高.工程引起的冲淤变化具有明显局地性,淤积增强区域主要集中在距人工岸线约 2 km范围内,年淤积速率增加0~0.6 m/a,外围区域冲淤变化趋缓;大鱼山岛南北两侧深槽区仍维持较高的流速和底床切应力,冲淤幅度有限,原有滩槽格局总体保持稳定.围填海工程改变了近岸潮流结构及泥沙再悬浮-沉降平衡,进而引起局地冲淤格局调整,其影响程度随距人工岸线距离的增加而逐渐减弱.

Land reclamation reshapes nearshore hydrodynamics and sediment transport by altering coastline mor-phology.In this study,the reclamation project at Yushan Island in Hangzhou Bay was investigated.A two-dimen-sional hydrodynamic-sediment coupling model was built using MIKE21 and validated,from which tidal-current fields,bed shear stress,suspended sediment concentration(SSC)distributions,and seabed scour-siltation charac-teristics before and after project implementation were systematically analyzed.Results show that the blocking ef-fect of artificial dikes reduced flow velocities by 0.2-0.5 m/s and bed shear stress by 0.2-0.4 N/m2 on the frontal and lee sides,suppressing sediment resuspension and decreasing nearshore SSC by 0.02-0.06 kg/m3.At dike corners,flow deflection increased velocity and bed shear stress by 0.1-0.3 m/s and 0.1-0.3 N/m2,respectively,causing increased SSC.The reclamation-induced scour-siltation variations showed pronounced local characterist-ics.In addition,the enhanced siltation was primarily concentrated within approximately 2 km of the artificial shoreline,and annual siltation rates increased by 0-0.6 m/a,whereas outer regions showed attenuated changes.Deep troughs on the north and south sides of Dayushan Island maintained high flow velocities and bed shear stress,showing limited morphological changes and overall stable channel-shoal patterns.Therefore,land reclama-tion altered nearshore current structures and the sediment resuspension-deposition balance,resulting in adjusted scour-siltation patterns,with the magnitude of these effects gradually decreasing with increasing distance from the artificial shoreline.

张子健;高飞;丁咚;曹珂

中国海洋大学海洋地球科学学院,青岛 266100中国地质调查局青岛海洋地质研究所,青岛 266237中国海洋大学海洋地球科学学院,青岛 266100中国地质调查局青岛海洋地质研究所,青岛 266237

海洋科学

围填海工程鱼山岛数值模拟悬浮泥沙浓度底床切应力海床冲淤

land reclamationYushan Islandnumerical simulationsuspended sediment concentrationbed shear stressseabed erosion and deposition

《海洋地质前沿》 2026 (9)

67-78,12

山东省自然科学基金"冬季黄海切变锋生成、演化规律及其沉积效应"(ZR2022MD105),"互花米草除治过程中盐沼沉积物多源碳库变化机制:以胶州湾滨海湿地为例"(ZR2023MD017)自然资源部研究式调查项目"基于数值模拟的舟山渔山岛海域围填区冲淤演化过程研究"(2024ZRYJDC010)中国地质调查局项目"长江口海岸带地质环境调查与监测"(DD20242714)

10.16028/j.1009-2722.2025.213