罗山县灵山河山洪沟治理工程设计分析OA
Analysis of the Design of the Flood Control Project of Lingshan River in Luoshan County
罗山县灵山河山洪沟防洪治理工程以疏挖整治、河岸防护、阻水灌溉溢流堰加固为主,结合河道及两岸地形、地质条件、施工条件等因素,通过河道疏挖、险工护岸、阻水溢流堰拆除重建等工程措施,对河道进行综合治理,以加大河道的行洪断面、提高行洪能力,保护河道两岸的居民区及沿河两岸的农田,减轻洪灾损失,保障人民群众正常生活和工作秩序,保障地方经济持续稳定发展.
The flood control project of Lingshan River in Luoshan County mainly includes river dredging and rectification,riverbank protection,and reinforcement of overflow weirs.Considering factors such as the river course,the terrain and geological conditions on both banks,and construction conditions,through engineering measures such as river dredging,river bank protection for the dangerous sections,and demolition and reconstruction of the overflow weir,the river course is comprehensively improved,to widen the flood discharge section and enhance the flood discharge capacity.This aims to protect the residential areas on both banks of the river and the farmland along the river,reduce flood damage,ensure the normal life and work order of the people,and guarantee the sustained and stable development of the local economy.
陈家俊
罗山县水利局,河南 罗山 464200
建筑与水利
河道治理岸坡防护稳定计算行洪能力
river regulationbank slope protectionstability calculationflood discharge capacity
《河南水利与南水北调》 2026 (7)
17-18,2
评论