考虑冰灾天气下不确定性的新型电力系统预防性优化调度方法OA
Preventive optimal dispatching method of novel power system considering uncertainties under ice disaster weather
冰灾天气时空过程的多变性对新型电力系统制定预防性优化调度方案提出了重大挑战,亟需在日前预防性调度中考虑冰灾天气下不确定性影响.针对冰灾天气中输电线路故障可能及可再生能源出力变化,文中提出计及输电线路故障率不确定性及风电-光伏-水电预测偏差不确定性的预防性分布鲁棒优化调度方法.文中考虑冰灾天气时空物理过程,构建冰灾天气下输电线路故障率模型.考虑冰灾天气下输电线路的故障率不确定性,构建输电线路故障模糊集和风-光-水预测偏差不确定集.基于模糊集构建两阶段分布鲁棒优化调度模型,优化机组开停机方式及线路维修调度方式,基于列-约束生成算法求解最恶劣输电线路故障率及最恶劣风-光-水预测偏差下的调度方案,通过 IEEE RTS-24 节点系统验证了所提调度模型和求解方法的有效性.
The variable spatial-temporal process of ice disaster weather presents a significant challenge for develo-ping preventive optimal dispatching schemes in novel power system,necessitating the incorporation of its uncertain influence into day-ahead preventive dispatching.In view of the potential for transmission line failure and the inter-mittent nature of renewable power output during ice disaster weather conditions,this paper proposes a distribution-ally robust preventive unit commitment method that incorporates uncertainties in both the failure rate of transmission lines and the prediction deviation of wind power,photovoltaic power as well as hydropower.The failure rate model of transmission lines under ice disaster weather is constructed by considering the spatial-temporal physical processes involved.Considering the uncertainty of transmission line failure rate under ice disaster weather,an ambiguity set for transmission line failure status and an uncertainty set for prediction deviations of wind-solar-hydro are construc-ted.A two-stage distributionally robust optimal dispatching model is constructed based on the ambiguity set,aiming to optimize the unit start-up/shut-down mode and line maintenance scheduling mode.And a column-and-constraint generation(C&CG)algorithm is employed to solve the optimal dispatching model considering the worst transmission line failure rate and wind-solar-water prediction deviation.The IEEE RTS-24 node system is used to verify the effec-tiveness of the proposed method of the proposed preventive dispatching model and solution method.
刘文霞;苑子俊;娄素华;程浩忠;何向刚
华中科技大学 强电磁工程与新技术国家重点实验室,武汉 430074||贵州电网有限责任公司电网规划研究中心,贵阳 550003上海交通大学 电力传输与功率变换控制教育部重点实验室,上海 200240华中科技大学 强电磁工程与新技术国家重点实验室,武汉 430074上海交通大学 电力传输与功率变换控制教育部重点实验室,上海 200240贵州电网有限责任公司电网规划研究中心,贵阳 550003
信息技术与安全科学
新型电力系统冰灾天气优化调度分布鲁棒线路恢复
novel power systemice disaster weatheroptimal dispatchingdistributionally robustline restoration
《电测与仪表》 2026 (9)
1-11,11
南方电网有限责任公司科技项目(067600KK52222008)
评论