滇中引水工程水源地奔子栏水电站库区泥沙淤积计算分析OA
Simulating Analysis of Sedimentation in the Reservoir Area of the Water Source for the Central Yunnan Water Diversion Project
针对全流域梯级开发背景下下游水源地水库泥沙淤积规律不清的问题,基于不平衡输沙理论,构建一维全沙河床冲淤数学模型,模拟并对比了滇中引水工程奔子栏水源地低坝与高坝2种方案,分析上游梯级开发前后运行100 a的库区泥沙冲淤响应规律.主要创新性认识如下:①上游梯级拦沙效应显著,使奔子栏水库入库沙量大幅减少、泥沙级配细化,其100 a总淤积量仅为不考虑上游拦沙时的2.85%(低坝方案)与4.27%(高坝方案);②来沙条件的改变促使库区淤积形态由典型的三角洲淤积转变为坝前带状薄层淤积,泥沙更易被输送至坝前并随水流排出,坝前淤积高程与库容损失均大幅降低;③对比表明,高坝方案在长期库容保留、坝前淤积高程控制及泥沙调蓄能力方面更具优势.研究成果揭示了全流域梯级开发对下游关键水源水库泥沙淤积的长期累积性影响,可为工程方案比选与优化运行提供科学依据.
[Objective]This study aims to address the insufficient understanding of long-term,cumulative sedimen-tation patterns in downstream water-source reservoirs under the influence of basin-wide cascade hydropower develop-ment.Specifically,it seeks to quantify how upstream cascade interception alters the sediment influx,gradation,deposition morphology,and capacity loss of the Benzilan Reservoir,which serves as the water source for the Central Yunnan Water Diversion Project.The research also provides a comparative evaluation of low-dam and high-dam schemes to inform optimal project selection and long-term operational safety.[Methods]A one-dimensional mathe-matical model for total sediment transport(HELIU-2)was developed based on non-equilibrium transport theory.The model incorporates simplified formulations of the flow continuity,momentum,and sediment continuity equa-tions,and separately accounts for suspended load and bedload transport.The computational domain covers a 78.71 km reservoir reach,discretized into 33 cross-sections.Due to the paucity of historical bathymetric data in the study area,model verification was conducted against the quasi-equilibrium long-term evolutionary trend of the Jin-sha River channel,inferred from cross-sectional surveys and local expert knowledge,rather than against a conven-tional measured erosion-deposition dataset.Four scenarios were simulated over a 100-year operational horizon:a low-dam scheme(normal water level 2 090 m)and a high-dam scheme(2 150 m),each considered both with and without the trapping effect of upstream cascade reservoirs.The sediment interception efficiency and the resulting downstream gradation modification were estimated using the equilibrium slope method,with cascade commissioning scheduled in a phased sequence over time.[Results]Upstream cascade interception exerts a dominant effect on the sedimentation regime of the Benzilan Reservoir.Compared with scenarios without upstream trapping,the 100-year total deposition volume is reduced to merely 2.85%for the low-dam scheme and 4.27%for the high-dam scheme.Concurrently,the intercepted sediment becomes substantially finer,as coarser fractions are preferentially retained in upstream reservoirs.This combined reduction in sediment load and grain size fundamentally alters the deposition pattern:the typical delta progradation observed under natural inflow conditions is replaced by a thin,band-shaped layer of fine sediment accumulating near the dam.For the low-dam scheme with upstream interceptio,the 100-year deposition volume is 0.054 billion m3,with a trap efficiency of 98.97%,a capacity loss of only 1.55%(all from dead storage),and a near-dam bed elevation of 2 014.86 m.For the high-dam scheme with interception,the corre-sponding values are 0.291 billion m3,93.87%,1.88%,and 2 017.39 m.In contrast,without upstream intercep-tion,the low-dam scheme exhibits delta-front advancement to the dam by the 50th year with a 54.54%capacity loss,while the high-dam scheme maintains the delta apex 17 km from the dam by the 100th year with a 44.11%ca-pacity loss.[Conclusion]Upstream cascade interception drastically reduces sediment inflow to the Benzilan Reser-voir.Incoming sediment also becomes substantially finer,as coarser fractions are preferentially retained upstream.This combined reduction in load and grain size transforms the deposition pattern from a prograding delta to a thin,band-shaped layer near the dam,allowing most fine sediment to be transported through the reservoir and flushed downstream.Consequently,near-dam aggradation and operational capacity loss are markedly reduced under both schemes.Comparatively,the high-dam scheme exhibits superior long-term capacity retention,lower near-dam bed-elevation rise,and better sediment regulation under identical upstream conditions.Quantitatively,this work fills a critical gap by systematically quantifying the cumulative interception effect of a multi-reservoir cascade on a down-stream water-diversion source,demonstrating that traditional predictions based solely on natural inflow conditions would severely overestimate actual sedimentation risks.However,extreme flood events and consolidation of fine co-hesive deposits may introduce additional uncertainties,warranting further investigation.
曾鑫;赵瑾琼;元媛;宫平
水利部长江重点实验室,武汉 430010||长江科学院河流研究所,武汉 430010||长江水利委员会水旱灾害防御创新团队,武汉 430010长江水利委员会河湖管理局,武汉 430010水利部长江重点实验室,武汉 430010||长江科学院河流研究所,武汉 430010水利部长江重点实验室,武汉 430010||长江科学院河流研究所,武汉 430010
建筑与水利
水源地库区泥沙淤积梯级开发数学模型滇中引水工程奔子栏水电站
water sourcereservoir sediment depositioncascade constructionmathematical modelCentral Yun-nan Water Diversion ProjectBenzilan hydropower station