复杂多金属铅锌矿综合回收过程中砷锑的脱除技术研究OA
Research on the Removal Technology of Arsenic and Antimony in the Comprehensive Recovery Process of Complex Polymetallic Lead-Zinc Ores
复杂多金属铅锌矿里砷锑的赋存形态繁杂,主要是以毒砂、辉锑矿以及固溶体的形式存在,这使得在选矿以及冶金过程中它们的迁移路径多样并且难以有效脱除,经过系统的矿物学分析、浮选分离以及冶金过程研究,揭示出了砷锑和诸金属矿物的共生关系以及其迁移转化机制,创新性地运用高选择性抑制剂达成砷锑的浮选预脱除,砷锑矿物回收率降低到15%以下,主金属回收率保持在85%以上.基于纳米吸附剂的溶液深度净化技术,吸附容量分别为砷45 mg/g和锑38 mg/g,去除率超过95%,比传统方法要好很多,高温固化技术借助矿相重构形成稳定的FeAsO4 矿物以及玻璃体结构,该技术使得砷锑脱除率超过95%.
The occurrence forms of arsenic and antimony in complex polymetallic lead-zinc deposits are complicated,mainly in the form of arsenopyrite,stibnite and solid solution,which makes their migration paths diverse and difficult to be effectively removed in the process of mineral processing and metallurgy.Through systematic mineralogical analysis,flotation separation and metallurgical process research,the symbiotic relationship between arsenic and antimony and the main metal minerals and their migration and transformation mechanism were revealed.The highly selective inhibitors were innovatively used to achieve the flotation pre-removal of arsenic and antimony.The recovery rate of arsenic and antimony minerals was reduced to less than 15%,and the recovery rate of main metals was maintained above 85%.The adsorption capacity of the solution deep purification technology based on nano-adsorbent is 45 mg/g for arsenic and 38 mg/g for antimony,and the removal rate is more than 95%,which is much better than the traditional method.The high temperature curing technology forms stable FeAsO4 minerals and vitreous structure by means of mineral phase reconstruction,which makes the removal rate of arsenic and antimony more than 95%.
孙振
扎兰屯市国森矿业有限公司责任公司,内蒙古 呼伦贝尔 162600
矿业与冶金
复杂多金属矿砷锑脱除浮选预脱除纳米吸附剂高温固化
complex polymetallic oreArsenic antimony removalFlotation pre removalNano adsorbentHigh temperature curing
《世界有色金属》 2026 (14)
49-51,3