Conventional plant factories(indoor vertical farming)are energy intensive and affected by surface climate whereas underground mine tunnels have a stable environment,and heat transfer through the surrounding rock envelope is expected to reduce cooling and heating loads of the environment control systems of the plant factories.The aim of this study is to numerically analyze short and long term heat transfer through the surrounding rock envelope for an underground plant factory(UGPF)located in a mine tunnel using ANSYS Fluent software.The model is compared with analytical results with discrepancies of 2.5 and 2.7%for light and dark periods,respectively,indicating the numerical model is acceptable for further utilization in thermal modeling of the UGPF.For the base case of 284 K virgin rock temperature,2.75 W/m.K rock thermal conductivity,303 and 297 K in-door air temperature in light and dark periods,the time weighted average overall heat transfer coefficient is high initially with 4.04 W/m^(2)·K,but reduces rapidly in the first 6 months to 0.75 W/m^(2)·K,then slows down to 0.48 W/m^(2)·K in 3 years when the system almost reaches the equilibrium status.The heat transfer rate and overall heat transfer coefficient reduction with time follow power relationships.The results indicate that long term heat loss to rock envelope instead of initial values should be used in determining the cooling capacity of the plant factory considering the worst-case scenario.The sensitivity analysis shows that the rock thermal conductivity is more influential on heat transfer rate than indoor air temperature and virgin rock temperature,the latter two have similar levels of influence.

Md Washim Akram;Huiqing Guo;Wenbin Hu

Department of Mechanical Engineering,University of Saskatchewan,57 Campus Dr,Saskatoon,SK S7N 5A9,CanadaDepartment of Mechanical Engineering,University of Saskatchewan,57 Campus Dr,Saskatoon,SK S7N 5A9,CanadaDepartment of Mechanical Engineering,University of Saskatchewan,57 Campus Dr,Saskatoon,SK S7N 5A9,Canada

矿业与冶金

Underground mine tunnelPlant factoryCFD simulationRock envelopeDynamic thermal analysis

《Energy and Built Environment》 2026 (3)

P.672-688,17

The authors express their gratitude to the College of Graduate and Postdoctoral Studies(CGPS)the Department of Mechanical Engineering at the University of Saskatchewanthe Natural Sciences and Engineering Research Council of Canada(NSERC)for their support and funding of this project.

10.1016/j.enbenv.2025.03.001