基于决策实验室分析与网络层次分析法的医用耗材采购供应链动态风险管理模型构建研究OA
Construction of a dynamic risk management model for procurement supply chain of medical consumables on the basis of decision making trial and evaluation laboratory and analytic network process
目的:基于决策实验室分析(DEMATEL)与网络层次分析法(ANP)构建医用耗材采购供应链动态风险管理模型,分析其在医用耗材管理中的应用价值.方法:通过文献梳理、专家访谈确立6个维度24个风险因素的指标体系,运用DEMATEL方法识别关键风险节点,采用ANP计算动态风险权重,构建融合DEMATEL与ANP的动态风险管理模型.选取2024年1月至12月新疆维吾尔自治区人民医院临床使用的1 200件医用耗材,根据管理模式不同,将1月至6月使用的600件医用耗材采用常规管理模式,7月至12月使用的600件医用耗材采用基于DEMATEL与ANP的动态风险管理模型(模型管理模式)进行管理,对比两种管理模式的医用耗材采购供应链动态风险管理效果.采用自制满意度问卷对耗材使用管理的医护人员、耗材管理人员和物资统筹专员进行临床管理满意率调研.结果:采用模型管理模式(600件)的供应商、采购、物流、库存、政策和技术6个维度的供应链风险发生率分别为3.33%、6.67%、6.33%、6.83%、7.00%和7.33%,均低于常规管理模式(600件)的13.67%、11.67%、12.33%、13.00%、13.33%和13.83%,两种管理模式比较差异均有统计学意义(x2=6.502、9.007、12.763、12.771、13.176、13.394,P<0.05);医用耗材平均采购周期、库存周转天数、管理清算流程时长和领用响应时间均短于常规管理模式,差异均有统计学意义(t=9.713、9.598、28.772、19.490,P<0.05);医用耗材月均紧急采购次数、月均缺货次数和月均非紧急采购次数均少于常规管理模式,差异均有统计学意义(t=26.271、22.064、25.888,P<0.05).医护人员、耗材管理人员和物资统筹专员对采用模型管理模式的临床管理满意率均高于常规管理模式,差异均有统计学意义(x2=4.800、9.585、4.286,P<0.05).结论:基于DEMATEL与ANP的医用耗材采购供应链动态风险管理模型,能够实现医用耗材供应链风险的精准防控与动态优化,提高耗材管理效率与质量,提升耗材使用管理人员满意率.
Objective:To construct a dynamic risk management model for procurement supply chain of medical consumables on the basis of decision making trial and evaluation laboratory(DEMATEL)analysis and Analytic Network Process(ANP),so as to analyze application value of that in managing medical consumables.Methods:An indicator system included 6 dimensions with 24 risk factors was determined through literature review and expert interviews.The DEMATEL method was used to identify key nodes of risks,and the ANP was used to calculate dynamic risk weights.Then,a dynamic risk management model of integrating DEMATEL and ANP was constructed.A total of 1,200 medical consumables that were used in clinical practice of People's Hospital of Xinjiang Uygur Autonomous Region from January to December 2024 were selected.According to different management modes,600 medical consumables that were used from January to June were managed by using conventional management mode,and 600 medical consumables that were used from July to December were managed by using the dynamic risk management model based on DEMATEL and ANP(model management mode).The effects of dynamic risk management for procurement supply chain of medical consumables of two kinds of management modes were compared.A self-made satisfaction questionnaire was used to investigate the satisfaction rates of medical staffs of using and managing consumables,managers for consumable,and commissioners for coordinating materials about clinical management.Results:The occurrence rates of risks in supplier,procurement,logistics,inventory,policy,and technique of six dimensions were respectively 3.33%,6.67%,6.33%,6.83%,7.00%,and 7.33%under the model management mode(600 medical consumables),all of which were lower than those under the conventional management mode(600 medical consumables),and the differences were statistically significant(x2=6.502,9.007,12.763,12.771,13.176,13.394,P<0.05).The average procurement cycle,turnover days of inventory,duration of management settlement process,and response time of getting materials under the model management mode were all shorter than those under the conventional management mode,and the differences were statistically significant(t=9.713,9.598,28.772,19.490,P<0.05).The monthly average times of emergency procurement,monthly average shortage times,and monthly average non-emergency procurement times for medical consumables under the model management mode were less than those under the conventional management mode,and the differences were statistically significant(t=26.271,22.064,25.888,P<0.05).The satisfaction rates of medical staffs of using and managing consumables,managers for consumable,and commissioners for coordinating materials about clinical management under the model management mode were all higher than those under the conventional management mode,and the differences were statistically significant(x2=4.800,9.585,4.286,P<0.05).Conclusion:The dynamic risk management model for procurement supply chain of medical consumables on the basis of DEMATEL and ANP can achieve precise prevention and control,and dynamic optimization for risks of supply chain of medical consumables,and improve efficiency and quality of managing consumables,and enhance the satisfaction rate of persons who use and manage consumables.
白生蕾;凌海波;余喜梅;吴婧
新疆维吾尔自治区人民医院医疗器械中心 乌鲁木齐 830000新疆维吾尔自治区人民医院医疗器械中心 乌鲁木齐 830000新疆维吾尔自治区人民医院医疗器械中心 乌鲁木齐 830000新疆维吾尔自治区人民医院运营管理与事业发展部 乌鲁木齐 830000
医药卫生
医用耗材采购供应链决策实验室分析(DEMATEL)-网络层次分析法(ANP)动态风险管理
Medical consumableProcurement supply chainDecision making trial and evaluation laboratory(DEMATEL)-Analytic network process(ANP)Dynamic risk management
《中国医学装备》 2026 (8)
100-106,112,8
评论