基于多源测绘数据融合的小型露天矿三维建模与应用OA
3D Modeling and Application of Small Open-Pit Mine based on Multi-Source Mapping Data Fusion
针对小型露天矿开采导致的地表形态剧变及生态环境影响量化困难的问题,本文提出了一种基于大地测量与遥感技术融合的三维建模与分析方法.该方法通过整合高精度GNSS、全站仪地面测量数据与航空摄影测量(APhG)点云,引入地形断裂线约束机制,构建了精细化的不规则三角网(TIN)模型.以辽宁鞍山千山山脉石灰岩矿为试验区,对两期监测数据进行对比分析.结果表明:该方法能精确重构矿区复杂地形,基于模型计算的开采量与生产记录反算值的相对误差仅为 1.7%,验证了模型的工程适用性.同时,空间分析揭示矿区与邻近鸟类保护区最小距离缩减至 70m,存在显著的生态胁迫风险.
To address the difficulties in quantitatively characterizing drastic landform changes and ecological impacts induced by small-scale open-pit mining,this study proposes a three-dimensional modeling and analysis method integrating geodetic surveying and remote sensing technologies.By combining high-precision GNSS data,total station ground-survey measurements,and aerial photogrammetric(APhG)point clouds,and by introducing a terrain breakline constraint mechanism,a refined Triangulated Irregular Network(TIN)model was constructed.The limestone mine in the Qianshan Mountains,Anshan,Liaoning Province,was selected as the test area,and two monitoring datasets acquired at different periods were comparatively analyzed.The results show that the proposed method can accurately reconstruct the complex terrain of the mining area.The calculated excavation volume based on the model,with a relative error of only 1.7%compared with the back-calculated value derived from production records,thereby demonstrating the engineering applicability of the model.Meanwhile,spatial analysis revealed that the minimum distance between the mining area and the adjacent bird reserve decreased to 70m,indicating a significant risk of ecological disturbance.
汪学君
中国建筑材料工业地质勘查中心辽宁总队,辽宁 沈阳 110004
矿业与冶金
小型露天矿多源数据融合TIN建模土方量计算生态监测
small open-pit minemulti-source data fusionTIN modelingearthwork calculationecological monitoring
《中国非金属矿工业导刊》 2026 (4)
117-120,4