大跨钢筋混凝土箱肋拱桥拓宽改造关键问题探讨OA

Discussion on Key Problems of Widening and Reconstruction of Long Span Reinforced Concrete Box Rib Arch Bridge

中文摘要英文摘要

针对早期建造的钢筋混凝土箱肋拱桥长期服役后普遍存在整体刚度不足、横向不均匀变形显著,且易成为交通瓶颈、通行安全性下降能够问题,以四川东兴寺釜溪河大桥为例,介绍了充分利用既有结构、新增混凝土拱肋实现拓宽需求,重建拱上排架增强拱肋间横向联系、提高结构整体受力性能的拓宽改造方案,可有效避免资源浪费,缩短工期,降低工程造价,且便于交通组织.

In view of the problems of poor overall stiffness,obvious lateral uneven deformation,and easy to become a traffic bottleneck and traffic safety decline of the early built reinforced concrete box rib arch bridge after long-term service,taking Fuxi River Bridge in Dongxing temple in Sichuan Province as an example,this paper in-troduces a widening and reconstruction scheme that makes full use of the existing structure,adds new con-crete arch ribs to realize the widening demand,reconstructs the bent on the arch to enhance the lateral con-nection between arch ribs,and improves the overall mechanical performance of the structure,effectively avoiding the waste of resources,shortening the construction period,reducing the project cost,and facilitating traffic organization.

何文飞;乔建刚;张一卓

天津市政工程设计研究总院有限公司,天津 300392天津市政工程设计研究总院有限公司,天津 300392天津市政工程设计研究总院有限公司,天津 300392

交通工程

箱肋拱桥拓宽改造刚度钢筋混凝土

box ribbed arch bridgeexpansion and renovationrigidityreinforced concrete